Pure Cold INSPIRATION2 Installation, Maintenance Manual 2022 | Issue Date: AUG 2022 REV 1
Prior to placing fixtures position place-
ment to wall, locate threaded leveling
bolts along the bottom rear of the case.
Finger wind the leveling bolts downward
to the floor as close as possible. Once rear
feet have been deployed, position case
into final position. (If multi fixture line
-
up,
aways start with endcap).
Fixtures are fitted with permanent castors for pushing fixtures into final position. Leveling Bolts should
be wound down upon final positioning of fixture with 24mm open end wrench
Icon Fixtures
have been pro-
vided with permanent-
ly mounted wheels to
easily move them into
position. This design
means that by Rule,
this is a mobile Appli-
ance; No Mechanical
Permits are required
prior to Installation.
Continue to front of case
and wind down both
front leveling bolts. Ad-
just all leveling bolts
(front and rear) to level
case using a bubble spirit
level and 24MM open
wrench.
Содержание 2CSMA1
Страница 2: ...2 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 5: ...5 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 6: ...6 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 23: ...23 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 26: ...26 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 31: ...31 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 40: ...40 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...