21
Ⅲ
. Uses and Operations
4) Operation of PULLEY-MAN
When installation of PULLEY-MAN is completed, start operation as instructed in this manual.
❶
Check below before operation.
●
Remove all factors of potential danger and obstacles around work area.
●
Check main body and hook and if there is entanglement or twisting on wire rope.
●
Check if wire moves up and down properly without load.
❷
Get ready to hang load.
●
Hook load with wire rope, chain, I-bolt or shackle safely as instructed in this manual.
Overloading is prohibited.
❸
Follow guidelines below during operation.
●
To prevent top of binding material from colliding with bottom of PULLEY-MAN main body, maintain at least
12in. (30cm) between bottom of main body and wire hook.
●
Do not ride on moving load.
●
Do not change direction of in-put power abruptly.
●
Do not operate under hanging load or PULLEY-MAN and stay away from vertical line of hanging load.
●
Make it sure that loose wire rope does not entangle with in-put power cable.
●
Keep loose wire rope away from load being lifted.
●
Do not step on loose wire rope.
❹
Check-up points after operation
●
Turn off in-put power source after operation.
●
Do not finish operation while load is hanging.
●
After outdoor operation, keep things around in order and keep PULLEY-MAN as instructed in this manual.
Содержание CSW-3060
Страница 1: ...www pulleyman co kr PULLEY MAN CO Ltd CSW 3060 Single Line Use Double Line Use...
Страница 11: ...10 Uses and Operations 1 Standard Offerings and Options AC Motor Double Line Options CSW 3060...
Страница 36: ...35 MEMO...
Страница 37: ...36 MEMO...