5.24
INSPECTION
•
After the first week of use.
•
Every 12 months.
5.5.3 CHECKING TECHNICAL CONDITION OF HYDRAULIC
CONNECTIONS AND SOCKETS.
Hydraulic connections must be technically reliable and kept in a clean condition. Each time
before connecting, check if sockets in tractor are maintained in good working condition.
Hydraulic systems of the tractor and trailer are sensitive to the presence of permanent
contamination, which may cause damage to precision system components.
INSPECTION
•
Each time before hitching trailer to tractor.
5.5.4 REPLACEMENT OF HYDRAULIC CONDUITS
INSPECTION
•
Every 4 years.
Rubber hydraulic conduits must be replaced every 4 years regardless of their technical
condition. This should be entrusted to specialised workshops.
5.6 LUBRICATION
Trailer lubrication should be performed with the aid of a manually or foot operated grease
gun, filled recommended grease. Before commencing work insofar as is possible remove old
grease and other contamination. Remove and wipe off excess oil or grease.
Содержание T023
Страница 4: ......
Страница 8: ......
Страница 9: ...SECTION 1 BASIC INFORMATION ...
Страница 23: ...SECTION 2 SAFETY ADVICE ...
Страница 32: ...Pronar T023 Pronar T023M SECTION 2 2 10 FIGURE 2 2 Locations of information and warning decals ...
Страница 33: ...SECTION 3 DESIGN AND OPERATION ...
Страница 47: ...SECTION 4 CORRECT USE ...
Страница 60: ...Pronar T023 Pronar T023M SECTION 4 4 14 ...
Страница 61: ...SECTION 5 MAINTENANCE ...
Страница 87: ...SECTION 5 PRONAR T023 PRONAR T023M 5 27 FIGURE 5 12 Trailer s lubrication points ...
Страница 97: ...NOTES ...
Страница 98: ... ...
Страница 99: ...ANNEX A TYRE WHEEL DISC 400 60 15 5 145A8 13 00x15 5 ET 15 360 65 16 148A8 11x16 ET 20 ...