3.2.3
MAIN BRAKE
3.6
3.2.4
PARKING BRAKE
3.11
3.2.5
ELECTRIC LIGHTING SYSTEM
3.11
3.2.6
SPARE WHEEL WINCH
3.14
4
CORRECT USE
4.1
4.1
PREPARING THE TRAILER FOR WORK
4.2
4.1.1
PRELIMINARY INFORMATION
4.2
4.1.2
HAND-OVER AND INSPECTION OF THE MACHINE AFTER
DELIVERY
4.2
4.1.3
PREPARING THE TRAILER FOR THE FIRST USE, TEST RUN
OF THE TRAILER
4.3
4.1.4
PREPARING THE TRAILER FOR NORMAL USE
4.4
4.2
HITCHING AND UNHITCHING THE TRAILER
4.5
4.3
LOADING AND SECURING LOAD
4.8
4.3.1
GENERAL INFORMATION ABOUT LOADING
4.8
4.3.2
SECURING LOAD
4.9
4.3.3
TENSIONER OPERATION
4.10
4.4
TRANSPORTING LOADS
4.10
4.5
UNLOADING
4.12
4.6
PROPER USE AND MAINTENANCE OF TYRES
4.12
5
MAINTENANCE
5.1
5.1
PRELIMINARY INFORMATION
5.2
5.2
MAINTENANCE OF WHEEL AXLE
5.2
5.2.1
PRELIMINARY INFORMATION
5.2
5.2.2
CHECKING SLACKNESS OF WHEEL AXLE BEARINGS
5.3
5.2.3
ADJUSTMENT OF SLACKNESS OF WHEEL AXLE BEARINGS
5.5
5.2.4
MOUNTING AND DISMOUNTING WHEEL, INSPECTION OF
WHEEL NUT TIGHTENING.
5.6
Содержание T023
Страница 4: ......
Страница 8: ......
Страница 9: ...SECTION 1 BASIC INFORMATION ...
Страница 23: ...SECTION 2 SAFETY ADVICE ...
Страница 32: ...Pronar T023 Pronar T023M SECTION 2 2 10 FIGURE 2 2 Locations of information and warning decals ...
Страница 33: ...SECTION 3 DESIGN AND OPERATION ...
Страница 47: ...SECTION 4 CORRECT USE ...
Страница 60: ...Pronar T023 Pronar T023M SECTION 4 4 14 ...
Страница 61: ...SECTION 5 MAINTENANCE ...
Страница 87: ...SECTION 5 PRONAR T023 PRONAR T023M 5 27 FIGURE 5 12 Trailer s lubrication points ...
Страница 97: ...NOTES ...
Страница 98: ... ...
Страница 99: ...ANNEX A TYRE WHEEL DISC 400 60 15 5 145A8 13 00x15 5 ET 15 360 65 16 148A8 11x16 ET 20 ...