![PRONAR RC2100 Скачать руководство пользователя страница 86](http://html.mh-extra.com/html/pronar/rc2100/rc2100_translation-of-the-original-copy-of-the-manual_1617427086.webp)
Pronar RC2100
SECTION 5
5.4
5.2.3 CHECK WHEEL AXLE BEARINGS FOR LOOSENESS
FIG. 5.1
Lifting jack support point
(1) U bolt
PREPARATION PROCEDURES
Hitch trailer to tractor, braking tractor with parking brake.
Park tractor and trailer on hard level ground.
Place securing chocks under one trailer wheel. Ensure that trailer shall not
move during inspection.
Raise front wheel (opposite to the side where chocks are placed).
The lifting jack should be placed under the axle between U bolts (1)
Figure (5.1) securing axle to shock absorber leaf springs, or as near
as possible to axle mounting. Recommended fulcrum is marked with
an arrow. Lifting jack must be suited to weight of trailer.
Содержание RC2100
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 24: ...Pronar RC2100 SECTION 1 1 14 ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 41: ...SECTION 2 Pronar RC2100 2 17 FIG 2 3 Locations of information and warning decals ...
Страница 42: ...Pronar RC2100 SECTION 2 2 18 ...
Страница 43: ...SECTION 3 DESIGN AND OPERATION ...
Страница 58: ...Pronar RC2100 SECTION 3 3 16 ...
Страница 59: ...SECTION 4 CORRECT USE ...
Страница 82: ...Pronar RC2100 SECTION 4 4 24 ...
Страница 83: ...SECTION 5 MAINTENANCE ...
Страница 113: ...SECTION 5 Pronar RC2100 5 31 FIG 5 12 Lubrication points part 1 ...
Страница 114: ...Pronar RC2100 SECTION 5 5 32 FIG 5 13 Lubrication points part 2 ...
Страница 123: ...NOTES ...
Страница 124: ... ...
Страница 125: ...ANNEX A Tyre dimensions LP AXLE FRONT REAR WHEEL BRAKE 1 215 75 R17 5 135 133 J 17 5x6 75 ...