Determine position for rack rails
Insert flange nut in
each front post
Lock release lever (back left)
1. Determine what height to place the 2U enclosure in the
rack, then place the right and left rack rails at the same
height on in the right and left rack position. Choose the
mounting holes accordingly for your rack system. Consult
the documentation for your rack if you are unsure which
holes to use. Note that three holes are required on each
front post, the uppermost of the three to be used for the
flange nuts to anchor the enclosure to the rack posts.
M
ounting
the
Vt
rak
e5300
F
/e5320
F
To install the 2U VTrak enclosure into a rack with the supplied mounting rails:
Notice that each end of the sliding rails have a lever to operate
the lock mechanism that grips the rack post.
16
VTrak J5000 Series
Promise Technology
Содержание VTrak J5000 Series
Страница 28: ...Drive slot numbering on VTrak J5300 Drive slot numbering on VTrak J5320 21 12G SAS JBOD User Guide ...
Страница 36: ...DB 9 pinout for RJ 11 to DB 9 serial cable 29 12G SAS JBOD User Guide ...
Страница 94: ...87 VTrak J5800 Zoning Configuration 3 Four zones divided access 12G SAS JBOD User Guide ...