
VTrak S3000 Quick Start Guide
2
VTrak S3000 Task List
•
Task 1: Unpacking the Boxes (below)
•
Task 2: Mounting the Appliance in a Rack (page 4)
•
Task 3: Configuring the VTrak Appliance (page 8)
•
Task 4: Mounting the Subsystem in a Rack (page 23)
•
Task 5: Installing Disk Drives in the Subsystem (page 26)
•
Task 6: Making Data Connections (page 28)
•
Task 7: Making Management Connections (page 34)
•
Task 8: Setting-up Serial Cable Connections (page 37)
•
Task 9: Powering-on the Subsystem (page 38)
•
Task 10: Setting-up the Subsystem (page 40)
•
Task 11: Configuring Storage on the Subsystem (page 46)
•
Task 12: Setting-up Basic Storage (page 54)
•
Task 13: Setting-up High Availability (page 62)
•
Contacting Technical Support (page 68)
Thank you for your purchase of the VTrak S3000 storage solution. This Quick
Start Guide is designed to help you unpack, install, connect, configure, and run
your VTrak S3000 system.
If you are adding VTrak RAID subsystems or JBOD enclosures to your VTrak
S3000 system, follow the Task List in this document. The Task Lists in other
Quick Start Guides do not cover VTrak S3000.
For complete information about your VTrak S3000 appliance, see the
VTrak
S3000 User Manual
on the software DVD.
Please see the software DVD for a complete set of user documents.
Task 1: Unpacking the Box
The VTrak S3000 appliance box contains the following items:
•
VTrak appliance
•
Bezel
•
Left and right mounting rails for the appliance
•
1.5 m (4.9 ft) Power cords, 2 each
•
Accessory box
•
Printed software license key
•
DVD with software install files and user documentation