MACHINE INSTALLATION
The installation site should meet the following minimum prerequisites:
-
Mains voltage and frequency comply with the specifications of the machine motor.
-
Ambient temperature from -10°C to +50°C.
-
Maximum relative humidity 90%.
Assembly of the machine
1.
Lock the work table securely on the column.
2.
Assemble the machine at a place where a uniform temperature is ensured. Make sure the installation
site for the machine is not exposed to direct sunlight. Otherwise, warp and loss of accuracy may be
caused.
3.
The machine base has two slotted holes for the fastening screws. Before tightening the screws check
that the work table is aligned in longitudinal and transverse directions with reference to the rotating
spindle. Use a dial gauge with 1/1000 accuracy and insert it together with the spindle taper into the
spindle to align the work table. For correct alignment, please insert shims of suitable thickness (to be
determined with feeler gauge) between the mounting surface and the machine base.
Cleaning and lubrication of the new machine
Prior to transport, the blank machine surfaces have been protected against corrosion using a high-viscosity
grease. This grease must be removed completely before the machine is put into operation. For this purpose,
use kerosene or cleaner's naphtha.
Note
:
Do not use paint thinner or similar substances as these can destroy the machine paint.
Make sure solvents or greases cannot come into contact with rubber or plastic parts.
After cleaning, apply an oil film to all blank parts; use
PROMAC's medium-viscosity oil, item No. 100385
.
PREPARATIONS FOR OPERATION
Prior to commissioning, check all machine components for correct condition and functioning. When observing
the machine-specific safety precautions and the proper machine operation procedures, the specified machine
precision will be guaranteed in the long run.