EmpyrE ElItE InstallatIOn and OpEratIOn manual
InsTallaTIon
Electrical Hookup
Have a junction box with a receptacle installed in the back of the furnace by a qualified electrician to ensure all
national and municipal codes are met. This is to be installed inside the back of the furnace on the bottom pan
surface or up on either side.
note:
The junction box and receptacle installation is to be a dedicated receptacle to run the furnace and the
circulating pumps.
Water line Hookup
It is recommended that a line be installed between the overflow port and suitable catch pan or drain.
1. Hook up supply to “Supply” port and return to “Return” port as indicated (see page 8).
2. Install shut off valves on all lines attached to the furnace to prevent loss of water during maintenance and repairs.
See Figures 1 to 3.
Important:
Pump must always be in lowest part of the water line system from the Empyre Elite to the building.
Pump may be at the furnace or in the building.
note:
The spacing between the tees must be no more than 4 times the diameter of the plumbing line size.
The Empyre System Optimizer may be installed in the vertical position.
Empyre
Elite
Figure 1
Closely Spaced Tees