background image

Printed in USA 3/06 © 2006

4

340-506-EN

Universal Rapid Toaster
340-TCE

Installation (continued)

To connect toaster units, push the rear toaster unit 
behind the front toaster unit, tilting the rear unit back 
and raising the bun chute of the rear unit slightly so 
that it slides over the BBLZ of the front unit. 

Lift the Front Edge of the Bun Chute 

So That It Slides Over the BBLZ

7

All electrical connections must be in accordance with 
local electrical codes and any other applicable codes.
A. Ensure that there are no wires or cords above the 

unit.

B. Plug the unit into an applicable electrical 

receptacle.

CAUTION

8

Operation

Your Universal Rapid Toaster may consist of a single chamber or may be composed of two independent toasting chambers 
which, when positioned together, operate as one toaster. Each chamber has its own power switch and Control Panel.

A. Turn the On/Off switch(es) located below the control panel on the side of the unit(s) to ON. After 20 seconds, the unit(s) will 

complete its internal setup, and the Control Panel screen will display OFF.

B. Wait for warm-up. This should take 15 minutes for muffins or bagels and 20 minutes for buns.

1

BURN/ELECTRICAL SHOCK HAZARD! Heating 
elements are HOT and can cause severe burns or severe 
shock! Keep hands and objects out of the toaster unit! 
Failure to exercise caution may result in serious injury! 
Turn the unit off, unplug it and let it cool down 
completely before touching or working on internal 
apparatus.
A. On the Control Panel, press the PRODUCT button to 

select the desired bread product (i.e., bagel, muffin, bun). 
The display shows the product selected.

B. Wait for warm-up. This should take 15 minutes for 

muffins or bagels and 20 minutes for buns.

WARNING

2

Содержание 340-TCE

Страница 1: ...s this warranty and all work must be performed by an authorized Prince Castle Service Agent All labor shall be performed during regular work hours Overtime premium will not be covered Travel charges a...

Страница 2: ...at 1 800 722 7853 or 630 462 8800 to arrange for a replacement unit 1 NOTE When installing this unit the ambient temperature at the mounting site should not exceed 37 8 C 100 F Your toaster may consis...

Страница 3: ...in position NOTE If yours is a single unit proceed to Step 10 Mounting Holes Align BBLZ Pushed Back into Position 5 A On the rear chamber push the bun chute into the toaster from the back toward the f...

Страница 4: ...sitioned together operate as one toaster Each chamber has its own power switch and Control Panel A Turn the On Off switch es located below the control panel on the side of the unit s to ON After 20 se...

Страница 5: ...prep table Load the buns so that the cut side makes contact with the grey platen cut side in There is a separate slot for the club flatbread section that allows toasting on both sides B Press START bu...

Страница 6: ...6 EN Universal Rapid Toaster 340 TCE Loading Diagram Radiant Heater Radiant Heater Cut Side Out Cut Side Out Radiant Heater Radiant Heater Cut Side Out Cut Side Out Crown Cut Side In Heel Cut Side In...

Страница 7: ...eels When Bagels are to be toasted change one chamber to BAGEL and begin the toasting process 15 minutes before changeover convert one chamber to BUNS REGULAR MENU Bun Loading Unlike other rapid toast...

Страница 8: ...ODUCT Button 2 I INFORMATION Button and UP and DOWN Scroll Buttons While holding the INFORMATION button press the UP and DOWN scroll buttons to view the settings and actual readings Toast Power operat...

Страница 9: ...lity change only the Toast Time settings For minor adjustments to the toast quality use the LIGHT DARK buttons INFORMATION Button UP and DOWN Scroll Buttons 2 Cleaning This unit is not watertight Do n...

Страница 10: ...ion of the platen and both sides of the club platen Add more High Temperature Grill Cleaning Solution to the URT Cleaning Tool as necessary C Place a sanitized cloth at the end of the Cleaning Tool an...

Страница 11: ...in blinking and corresponding heater should begin to heat Verify that heat is being generated by the heater 6 Press the down arrow to move to relay 2 and heater 2 Verify that the relay is operating Th...

Страница 12: ...l an appropriate combination is reached Relay is shorted Remove side panel to view relay When the unit is not calling for heat the LED on the relay should not be lit Measure the voltage across the out...

Страница 13: ...he PRODUCT button Hold these buttons until the display reads Heater Test 4 Press the INFORMATION button 5 The LED on relay 1 should begin blinking and corresponding heater should begin to heat Verify...

Страница 14: ...ace temperature probe Relay is shorted Remove side panel to view relay When the unit is not calling for heat the LED on the relay should not be lit Measure the voltage across the output terminals of t...

Страница 15: ...e encoder 6 Use the UP arrow button scroll to Volume Level 7 Press both the right and left arrows at the same time The display will change to Set Home Switch 8 Locate the two set screws on the collar...

Страница 16: ...Printed in USA 3 06 2006 16 340 506 EN Universal Rapid Toaster 340 TCE Exploded View and Parts List...

Страница 17: ...340 506 EN 17 Printed in USA 3 06 2006 Universal Rapid Toaster 340 TCE Wiring Diagram...

Страница 18: ...355 East Kehoe Blvd Carol Stream IL 60188 USA Telephone 630 462 8800 Fax 630 462 1460 Toll Free 1 800 PCASTLE www princecastle com Printed in 3 06 Prince Castle Inc...

Отзывы: