14
BAD BOY
®
SPOT LUMINAIRE FIELD SERVICE MANUAL
TESTING
Test Screen
The luminaire provides built-in test routines and recalibration
options which can be accessed through the Menu Touchscreen.
Actions may be applied to specific mechanisms, or in some
cases, to all mechanisms at once. At the Home screen, press the
Test panel to bring up the Test screen.
Options are as follows:
+
Re-Cal
- press to bring up Recalibration Screen.
+
Re-Call ALL
- press to bring up Re-Cal ALL Yes/No options.
+
Disable
- press to bring up Disable Screen.
+
Mech Test
- press to bring up Mech Test Screen. (See
"Mechanical Tests"
on page 15 for more explanation of this
screen.)
+
Clean Lenses
- press to position lenses so that all surfaces
may be cleaned with a cloth. (Note that pressing the button
does not actually clean the lenses.) Refer to
"Cleaning the
Lenses"
on page 36 for complete lens cleaning instructions.
+
Group Test
- allows multiple Bad Boy luminaires to be run
through a configurable test sequence when chained together
via DMX512 or Ethernet. (See
"Group Test"
on page 16 for
more explanation of this screen.)
Press TEST to
bring up Test screen
Test Sub-Menu Screens
Содержание Bad Boy Spot Luminaire
Страница 1: ...SOFTWARE VERSION 1 6 WWW PRG COM BAD BOY SPOT LUMINAIRE FIELD SERVICE MANUAL...
Страница 11: ...1 DESCRIPTION This chapter contains an overview of luminaire features and components FEATURES COMPONENTS...
Страница 20: ...12 BAD BOY SPOT LUMINAIRE FIELD SERVICE MANUAL Notes...
Страница 34: ...26 BAD BOY SPOT LUMINAIRE FIELD SERVICE MANUAL Notes...
Страница 102: ...94 BAD BOY SPOT LUMINAIRE FIELD SERVICE MANUAL Notes...
Страница 103: ...A TECHNICAL SPECIFICATIONS BAD BOY SPOT LUMINAIRE BAD BOY ROAD CASE AC LINE CURRENT POWER VS VOLTAGE...
Страница 114: ...Bad Boy Spot Luminaire Field Service Manual Version as of November 10 2010 PRG part number 02 9812 0005 C...
Страница 115: ...Production Resource Group Dallas Office 8617 Ambassador Row Suite 120 Dallas Texas 75247 www prg com...