On overview of the MOST IMPORTANT information
for installation and assembly
Installing the container
Caution:
When installing the containers, you must observe the
accident prevent
regulations
and the
specific installation instructions for the containers
(see
the reference in chapter 1.1).
On-site conditions
The subsurface must be sufficiently
stable and water permeable
.
In particular, observe:
•
Water table level
•
Installation depths (recommendation: do not exceed a maximum installation depth of 1.2
m)
•
Distances to buildings and property boundaries
•
Traffic loads
Filling material
The filling material around the PE container must be
compactable, permeable, and free of
sharp objects
. Excavated soil or
“filler sand” often does not meet these criteria.
Note:
Our recommendation: Gravel with a maximum grain size of 8/16 mm
Work procedure
1. Build a stable, level foundation (20 cm) from filling material.
2. Verify the integrity of the containers and their components and carefully place them into
the pit without damaging them.
3. Fill up lifter with water (due to uplift) and then fill the containers with water up to a
maximum of 25% to stabilise them.
4. Add the filling material and compress in layers using a hand tamper.
5. Connect the inflow, outflow and connection pipe.
6. Position the shaft elements. When doing so, install the shaft assembly set and adjust the
height of the shafts as necessary (make sure there is sufficient space for the technology
capsule).
7. Pass the cable conduit (DN50/DN100) and air intake hose through the shaft and place
the air inlet supports in a suitable position with a steady intake of the cleanest possible
air. If necessary, extend the hose (up to max. 10 m). The hose gradient is in the direction
of the intake manifold.
8. Fill the rest of the excavated pit with filling material.
9. Check that the supply pipe and the roof deaeration provide sufficient aeration and
deaeration for the containers (install a separate aeration pipe if necessary).
Содержание Solido SMART
Страница 49: ...8 S40 control unit and available settings Premier Tech 49 64 Solido SMART DOKK5110E 15 04 2020...
Страница 56: ...9 Operational failures and resolving them Premier Tech 56 64 Solido SMART DOKK5110E 15 04 2020 NOTES...
Страница 60: ...10 Appendix Premier Tech 60 64 Solido SMART DOKK5110E 15 04 2020 10 4 EC declaration of conformity...