
6. Inspection, maintenance and desludging
Premier Tech
30 / 64
Solido SMART
DOKK5110E 15.04.2020
6.6 Desludging
•
Make sure of desludging (on demand) if SSV90
norm
-level
(referred to HRmax)
is
reaching 700 ml/l
(measure with dilution 1+3 and multiply result by 4)
.
•
For desludging make sure to use integrated desluding/inspection pipe (d=160mm)
indicated by this pictogramm only, in order to enable proper desludging and to
prevent damage to components.
•
Avoid desludging during sedimentation phase (around 12 to 2pm).
Recommended: between 2 and 3 pm, low water level after clearwater discharge.
•
There is no need to open the lid of the system or take out the capsule for desludging.
•
The design of the pipe will make sure that at least 10% of the volume will stay inside
the tank. This is mandatory to keep up the performance of the plant right after
desludging.
•
It is recommended to fill up tank with water after desludging (around 1/3 of max. level)
•
Make sure to document desludging in operations logbook
With
SMART+P EM2
(two chamber tank M2) the desludging is done in the same way.
There is an opening in the baffle at a specific height, in order to desludge the first
chamber almost completely and leaving a water level of about 25cm in the second
chamber. Considering the whole volume there will remain enough sludge to continue
the biological process.
Universal pipe
Inspection
Desludging
Level of active
sludge always
remaining
Inlet
Содержание Solido SMART
Страница 49: ...8 S40 control unit and available settings Premier Tech 49 64 Solido SMART DOKK5110E 15 04 2020...
Страница 56: ...9 Operational failures and resolving them Premier Tech 56 64 Solido SMART DOKK5110E 15 04 2020 NOTES...
Страница 60: ...10 Appendix Premier Tech 60 64 Solido SMART DOKK5110E 15 04 2020 10 4 EC declaration of conformity...