
PP-FCTA-QL
Ceiling Attachment
Solid Surface
Wood Stud
1) Determine the mounting location.
2) Use a 1/8˝ drill bit to pre-drill the mounting holes.
3) Secure the four (4) ¼˝ eye lag screws to the wood
stud in the ceiling.
4) Run the open end of the
1
/
16
˝
braided cable through
the hole in the eye lag screw.
5) Run the open end through the loop.
6) Pull the open end down until the
1
/
16
˝
braided cable
tightens around the eye lag screw.
7) Repeat through for the remaining three
mounting points.
The PP-FCTA-QL must be secured using the Quick
Locks and
1
/
16
˝
braided cables (supplied).
Anchoring eye bolts are commercially available.
1) Determine the mounting location.
2) Use a ¼˝ concrete drill bit to pre-drill the mounting
holes.
3) Place the concrete anchor into the pre-drilled hole
and gently tap into place using a rubber mallet or
hammer.
4) Run the open end of the
1
/
16
˝
braided cable through
the hole in the eye anchor bolt.
5) Run the open end through the loop.
6) Pull the open end down until the braided cable
tightens around the eye anchor bolt.
7) Repeat through for the remaining three
mounting points.
Wood Stud Ceiling
Concrete Ceiling
Eye Lag Bolt
Eye Anchor Bolt
Proceed to the ″Quick Lock Installation″ on page 10.
Proceed to the ″Quick Lock Installation″ on page 10.
Page 8