PP-FCTA-QL
1) Once the ceiling plate assembly is resting on the t-bar
frame rails, use a screwdriver to tighten the four (4)
M5 x 16mm combo screws.
2) Slide the upper plate assembly over the hole that was
cut in the tile and center it over the hole.
3) Tighten all four (4) jam nuts.
1) Cut the tile where the electrical box is going to be
secured.
2) Using (commercially available) hardware depending
on electrical installation environment, install the
electrical box and secure it to the ceiling plate
assembly.
3) Make all electrical connections at this time.
Electrical Box
Cut-out
Securing the Ceiling Plate
Do not overtighten the mounting screws.
M5 x 16mm Combo Screw
Tiles
T-Bar Frame Rails
Electrical Box Cut-out Removal
Electrical installation should be done in accordance to
local codes and regulations.
Electrical Box
(Commercially
Available)
Proceed to the ″Electrical Box Cut-out Removal″
section below.
Proceed to the ″Ceiling Attachment″ section.
Upper Plate Assembly
Upper Plate Assembly
Page 7