PREMAS® 4.0 Installation and Commissioning Manual
Page 24 / 44
4.2.4.3
Required materials in addition to PREMAS® 4.0 scope of delivery
•
For electrical work
-
Cable according local standard for sensor signals, shielded, twisted pair ,
length depending on local situation (from sensors to IoT box)
-
Small junction box (
to connect sensor’s system cable with extension cable)
-
Material for laying of sensor and antenna cable
-
Material for wall-mounting of the IoT box
4.2.4.4
Installation Preparation
Before you install PREMAS® 4.0, please go through the following steps to make sure you get
most of your Predictive Maintenance Solution.
Minimal technical requirements for successful installation
Mobile 3G/4G coverage available at IoT box location?
Power supply 110V or 230V available?
Are the required signals available at the plant which need to be connected to the IoT
Box from the plant control system: Motor Current, Level Switch, Speed Switch,
Straight run warning?
Is free and safe access to the chosen location given and work areas prepared for safe
installation work?
Did you receive the login data to access PREMAS® Portal? If not, please check first
internally who should have got the access (predefined Users). In case you cannot
find it, contact your AUMUND Support.
Do you have your mobile device with internet access ready to access PREMAS®
Portal?
Exposed buckets and moving parts will cause severe injury or death.
Lock-out, tag-out, check-out the machine prior to installation of the sensors.