5. Tension the second stage drive belt to 110-120 lbs (50- 54.4 kgs), see
Drive Belt Tension Adjustment" on page 49
6. Fully tighten the two Generator/Eddy Brake assembly and two Drive Components
assembly carriage bolts, torque to 180 in-lbs (20.3 Nm).
7. Route and reconnect the Generator cable and Eddy/Brake cable to the LPCA Gen-
erator input (J1) and Eddy/Brake load (J7)
I/O
1
connectors. Reinstall the LPCA/Battery
module cover and secure with the #2 Phillips screw fastener.
1
Input and Output Interface.
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 102
6 Replacement Procedures
Generator/Eddy Brake assembly Replacement