background image

4

5

TOOLS REQUIRED FOR INSTALLATION

Below are some tools needed to install the operator:

ELECTRICAL INSTALLATION

To start the operator installation, a connection to the 127V or 

220V mains through a symbolized power point, from a socket, 

based on the official standard for sockets, (norm NBR 14136), 

a standard provided with an ground conductor.

POWER CORD WITH GROUNDING PLUG

For the installation of the operator, it is provided 

with a 3-pin plug. The middle pin is connected to 

the metal part of the operator, which connected 

to the socket is in direct contact with the network 

ground wire, increasing user safety.

IMPORTANT

The equipment must be powered via a residual differential current (DR) 

device with a rated residual operating current exceeding 30 mA.

PENCIL

SCREWDRIVER

SAW ARCH

FRAME

UNIVERSAL 

PLIERS

ALLEN WRENCH

3, 4 AND 6mm

HAMMER

PHILIPS KEY

Ground connexion 

Ground connexion 

CUTTING

PLIERS

10mm CANNON 

WRENCH

DRILLING MACHINE

STAR KEY

NOZZLE

PLIERS

10,13,22 and 28mm 

MOUTH KEY

COMMON LEVEL

STAIRS

RATCHET WRENCH

LASER

LEVEL

Содержание TORE

Страница 1: ...RATOR FOR SLIDING SOCIAL DOOR TORE Technical Manual P09875 05 2022 Rev 0 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP...

Страница 2: ...l installation maintenance is completed completed Always make the electrical connections of the command center with the electrical network turned off After installation make sure that the door parts d...

Страница 3: ...rovided with a 3 pin plug The middle pin is connected to the metal part of the operator which connected to the socket is in direct contact with the network ground wire increasing user safety IMPORTANT...

Страница 4: ...ERATURE RANGE 5 C 50 C 5 C 50 C 5 C 50 C ISOLATION TYPE Class B 130 C Class B 130 C Class B 130 C TECHNICAL CHARACTERISTICS PROCEDURE BEFORE INSTALLATION Identify at the place of installation what is...

Страница 5: ...weight of the leaves proceed as follows Find the square area of the leaf multiplying height x width and the result multiply by 25 Kg which is the weight of the m of the 10 mm glass Then you will have...

Страница 6: ...he tips at the beginning of the Technical Manual Procedures before installation Follow the steps below 1 Step Drilling the rail Drill a hole in the middle of the rail then drill holes at the ends 150...

Страница 7: ...holes in part 4 Note that the holes that fit in part 4 are at the bottom of part 5 Tighten parts 4 and 5 with parts 6 7 and 8 and tighten parts 2 and 5 with part 9 See the example in figure 10 and th...

Страница 8: ...cushioned by the stop rubbers RADAR Radar is a sensor that triggers the automatic door when an object approaches its detection radius Technical specifications Power supply voltage 12 to 24 VDC Frequen...

Страница 9: ...rnai radar will detect the movement As the second sensor will not activate the automatic door may Glose at the exact time of scheduled automatic closing aiding in the optimization of air conditioning...

Страница 10: ...ough the rail and fixed with clamps The command for activating the photocell must be made from an NC Normally Closed contact that is for the board to receive a photocell command the connection between...

Отзывы: