11
3.3
Install the Unit
Always keep 200 mm of free space behind the UPS rear panel.
Check that the indications on the name plate located on the top cover of the UPS
meets to the AC-power source and the true electrical consumption of the total load.
1.
Connect the UPS input socket
to the AC-power source using
the cable of the protected
equipment.
2.
Connect the loads to the UPS
using the cables.
Note: The UPS charges the battery as soon as it is connected to the AC-power source,
even if button is not pressed.
Once the UPS is connected to the AC-power source, 8 hours of charging are required
before the battery can supply the rated backup time.
Содержание 10122192
Страница 10: ...5 2 2 Rear panels Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS ...
Страница 11: ...6 Tower 3K Tower 3KS ...
Страница 12: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS 36V 72V 5 5 8 8 10 5 3 1 7 8 4 6 2 13 11 ...
Страница 18: ...13 3 3 1 RT models Rack installation Follow steps 1 to 4 for module mounting on the rails 1 1 2 3 3 4 4 ...
Страница 20: ...15 2k 3k 3 4 2 RT models ...
Страница 40: ......
Страница 46: ...8 1 USV Schaltdiagramm 33 8 2 USV Spezifikation 33 ...
Страница 51: ...5 2 2 Rückseiten Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS Schuko Thai Schuko Thai ...
Страница 52: ...6 Tower 3K Tower 3KS Schuko Thai Schuko Thai ...
Страница 53: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Страница 59: ...13 3 3 1 RT Modelle Rackeinbau Befolgen Sie die Schritte 1 bis 4 für die Modulmontage auf den Schienen ...
Страница 61: ...15 2k 3k 3 4 2 RT Modelle ...
Страница 91: ...5 2 2 Panneaux arrières Tour 1K 1KS 1 5K 1 5KS Tour 2K 2KS Schuko Thai Schuko Thai ...
Страница 92: ...6 Tour 3K Tour 3KS Schuko Thai Schuko Thai ...
Страница 93: ...7 MBE en Tour RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Страница 99: ...13 3 3 1 Modèles RT Installation de la baie Suivre les étapes 1 à 4 pour monter le module sur les rails ...
Страница 101: ...15 2k 3k 3 4 2 Modèles RT ...
Страница 114: ...28 ...