30
7
Troubleshooting
Typical alarms and faults:
To check the UPS status and Event log:
1. Press any button on the front panel display to activate the menu options.
2. Press the button to select Event log.
3. Scroll through the listed events and faults.
The following table describes typical conditions.
Conditions
Possible cause
Action
Battery mode
LED is On. 1 beep
every 4 seconds.
A utility failure has occurred,
and the UPS is in Battery
mode.
The UPS is powering the equipment with
battery power. Prepare your equipment
for shutdown.
Battery low
LED is On.
1 beep every
second.
The UPS is in Battery mode
and the battery is running
low.
This warning is approximate, and the
actual time to shutdown may vary
significantly.
No battery
LED is On. Beep
continuous.
The batteries are
disconnected.
1. Verify that all batteries and detective
cable (RJ45) are properly connected.
2. Check the LCD menu: Settings –
External battery. If select the “Manual
EBM” and Value is 0, please set the right
value.
Battery fault
LED is On. Beep
continuous.
The battery test is failed due
to bad or disconnected
batteries, or the battery
minimum voltage is reached
in OBM cycling mode.
Verify that all batteries are properly
connected. Start a new battery test: if the
condition persists, contact your service
representative.
The UPS does not
provide the
expected backup
time.
The batteries need charging
or service.
Apply utility power for 48 hours to
charge the batteries. If the condition
persists, contact your service
representative.
Содержание 10122192
Страница 10: ...5 2 2 Rear panels Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS ...
Страница 11: ...6 Tower 3K Tower 3KS ...
Страница 12: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS 36V 72V 5 5 8 8 10 5 3 1 7 8 4 6 2 13 11 ...
Страница 18: ...13 3 3 1 RT models Rack installation Follow steps 1 to 4 for module mounting on the rails 1 1 2 3 3 4 4 ...
Страница 20: ...15 2k 3k 3 4 2 RT models ...
Страница 40: ......
Страница 46: ...8 1 USV Schaltdiagramm 33 8 2 USV Spezifikation 33 ...
Страница 51: ...5 2 2 Rückseiten Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS Schuko Thai Schuko Thai ...
Страница 52: ...6 Tower 3K Tower 3KS Schuko Thai Schuko Thai ...
Страница 53: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Страница 59: ...13 3 3 1 RT Modelle Rackeinbau Befolgen Sie die Schritte 1 bis 4 für die Modulmontage auf den Schienen ...
Страница 61: ...15 2k 3k 3 4 2 RT Modelle ...
Страница 91: ...5 2 2 Panneaux arrières Tour 1K 1KS 1 5K 1 5KS Tour 2K 2KS Schuko Thai Schuko Thai ...
Страница 92: ...6 Tour 3K Tour 3KS Schuko Thai Schuko Thai ...
Страница 93: ...7 MBE en Tour RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Страница 99: ...13 3 3 1 Modèles RT Installation de la baie Suivre les étapes 1 à 4 pour monter le module sur les rails ...
Страница 101: ...15 2k 3k 3 4 2 Modèles RT ...
Страница 114: ...28 ...