1
1
Introduction
Thank you for selecting PowerWalker VFI ICT/ICR IoT UPS to protect your electrical
equipment. We recommend that you take the time to read this manual to take full
advantage of the many features of the UPS (Uninterruptible Power System).
Before installing the UPS, please read the booklet presenting the safety instructions.
Then follow the indications in this manual.
1.1
Electronic equipment protection
The UPS protects your sensitive electronic equipment from the most common power
problems, including power failures, power sags, power surges, brownouts, line noise,
high voltage spikes, frequency variations, switching transients, and harmonic
distortion.
Special characteristic:
•
Double converter with pure sine waveform output
•
Full digital control
•
Higher power density, and output PF = 1
•
Wider input voltage range: 110Vac~300Vac
•
Higher efficiency: 93% for 2K/3k, 89% for 1k
•
Input THDI<5%
•
Bigger charger current for long backup mode:8A, adjustable from 2A to 8A through
LCD
•
EBM quantity auto detection
•
Communication ports: RPO, Dry in, Dry out, intelligent slot, USB, RS232
•
IoT: Ethernet(default) and Wireless (Optional)
•
Dot-matrix LCD, it supports Multi-Language
•
ECO Mode
•
Start-able without battery.
Содержание 10122192
Страница 10: ...5 2 2 Rear panels Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS ...
Страница 11: ...6 Tower 3K Tower 3KS ...
Страница 12: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS 36V 72V 5 5 8 8 10 5 3 1 7 8 4 6 2 13 11 ...
Страница 18: ...13 3 3 1 RT models Rack installation Follow steps 1 to 4 for module mounting on the rails 1 1 2 3 3 4 4 ...
Страница 20: ...15 2k 3k 3 4 2 RT models ...
Страница 40: ......
Страница 46: ...8 1 USV Schaltdiagramm 33 8 2 USV Spezifikation 33 ...
Страница 51: ...5 2 2 Rückseiten Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS Schuko Thai Schuko Thai ...
Страница 52: ...6 Tower 3K Tower 3KS Schuko Thai Schuko Thai ...
Страница 53: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Страница 59: ...13 3 3 1 RT Modelle Rackeinbau Befolgen Sie die Schritte 1 bis 4 für die Modulmontage auf den Schienen ...
Страница 61: ...15 2k 3k 3 4 2 RT Modelle ...
Страница 91: ...5 2 2 Panneaux arrières Tour 1K 1KS 1 5K 1 5KS Tour 2K 2KS Schuko Thai Schuko Thai ...
Страница 92: ...6 Tour 3K Tour 3KS Schuko Thai Schuko Thai ...
Страница 93: ...7 MBE en Tour RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Страница 99: ...13 3 3 1 Modèles RT Installation de la baie Suivre les étapes 1 à 4 pour monter le module sur les rails ...
Страница 101: ...15 2k 3k 3 4 2 Modèles RT ...
Страница 114: ...28 ...