GB
- -
0000-gb EInsaTZ_877
OpEraTiON
Lightning during use on roads
If desired, a lightning unit can be supplied.
For single parts see spare parts list.
Check before putting into operation
- Implement connected horizontally.
- Upper link correctly positioned.
- Lower link (4) laterally secured.
- Drive shaft adapted to correct length.
- Rotary r.p.m. pre-selected per table.
Change speed transmission
The rotor r.p.m. (215, 296, 9 min-1) is to be preselected from the
table according to operating conditions and tractor power.
Attention!
• Combustion danger through hot gears
- this hint is applied to all gears at the machine
- hold distance, use protective gloves
• Before operating the gear control lever turn off the
motor
Safety point
Danger - stay clear
of rotating machine
parts.
O b s e r v e s a f e t y
distance when engine
is running with p.t.o.
connected.
Power-take-off r.p.m. 1000 min
-1
Hint:
Use only this r.p.m. so that various drive components on the tractor
and implement are not subject to additional load.
Working depth adjustment
The working depth (T) is determined by the swivel range of the
attached roller.
The left and right bolts act as buffers when they are placed in
corresponding holes in the hole pattern.
For safety reasons, implement should stand on the
ground when adjustments are being made.
- Twist and remove bolts.
- Place left and right bolts in the corresponding holes and secure
by twisting.
495.737
III.
II.
215
1000
296 393
I.
min
-1
min
-1
Содержание LION 5000
Страница 15: ... 15 0000 SCHMIERPLAN_873 ...
Страница 18: ...GB Anhang Titelblatt _BA Allgemein GB Supplement ...