1. The pipes and formed pieces have to be fitted together up to the con
nector basis. Only the original profile seals of the building kit or the
original spare seals may be used between the individual elements.
Before assembly, the seals must be treated with the silicone paste
which is part of the scope of delivery. When routing the pipes care
must be taken that the pipes are installed in line and without tension.
In this way leaking of the seals is prevented.
2. For fastening the support rail in the opposite wall of the duct opening,
a bore hole (d=10 mm) must be provided on the level of the opening
edge. Then the pin of the support rail has to be hammered into the
bore hole.
3. The flue pipe is lowered from the top into the duct. For this, connect a
rope to the support leg and insert the pipes, section by section, from
the top. To prevent the components sliding apart during assembly, the
rope must be kept on tension until the final assembly of the flue pipe.
If spacers are necessary, these have to be fitted to the duct at least
every 2 m.
Cant the spacers at a right angle and align centric in the duct. Pipes
and formed parts are to be installed in such a way that the connectors
are arranged counter to the flow direction of the condensed water.
After the pipes have been inserted, place the support leg in the sup
port rail and align (flush and without tension). The duct cover at the
chimney head must be assembled in such a way that no rainfall can
get into the space between flue pipe and duct and the air for back
ventilation can flow freely.
Caution
When replacing seals use new seals!
When the flue pipes are dis-assembled, new seals must be used
for the reassembly!
6.4.6 Cleaning and inspection openings
Danger
Clean exhaust gas pipelines!
It should be possible to clean the flue gas pipes and inspect their
free cross-section and leakproofness.
At least one cleaning and inspection opening must be installed in the in
stallation room of the EC four.
Exhaust gas pipes in buildings, which cannot be cleaned or inspected from
their port side must have an additional cleaning port in the upper part of
the exhaust system or above the roof.
The exhaust gas pipelines at the outer wall must have at least one clean
ing opening in the lower part of the exhaust gas facility. For exhaust gas
facilities with building heights of < 15.00 m in the vertical section, a pipe
line length of < 2,00 m in the horizontal section and a maximum pipeline
diameter of 150 mm with a maximum deflection (except for deflection di
rectly at the boiler and in the shaft) one cleaning and inspection opening in
the installation room of the EC four is sufficient.
Fig.25 Assembly of the support rail
RA-0000157
2
Fig.26 Insertion into the duct
RA-0000158
3
6 Installation
48
7636047 - 02 - 24082015
Содержание eurocondense four 125 kw
Страница 19: ...3 2 6 Wiring diagram Fig 3 Wiring diagram 3 Technical specifications 7636047 02 24082015 19 ...
Страница 39: ...5 5 2 Legend Fig 21 Legend for application examples part 1 5 Before installation 7636047 02 24082015 39 ...
Страница 40: ...Fig 22 Legend for application examples part 2 5 Before installation 40 7636047 02 24082015 ...
Страница 143: ...13 Appendix 13 1 Declaration of conformity 13 Appendix 7636047 02 24082015 143 ...
Страница 146: ...Index 146 7636047 02 24082015 ...
Страница 148: ...7636047 02 24082015 ...