
Fig. 5: Conversion of the supply air connection
3
2
2
1
1
3
A
B
Side supply air connection (A)
1. Remove lower rear wall (2) of the EuroCondense three
2. Loosen screws and remove the cover plate (1)
3. Remove the intake pipe leading upward from the intake pipe elbow (3)
4. Turn intake pipe elbow (3) into the side position
5. Mount lower rear wall (2)
Rear supply air connection (B)
1. Remove lower rear wall (3) of the EuroCondense three
2. Take out cover plate (2) from lower rear wall (3)
3. Remove the intake pipe leading upward with intake pipe elbow
4. Mount straight intake pipe (1)
5. Mount lower rear wall (3)
Before installation
7308536-02 06.13
Condensing gas boiler Eurocondense three125-300 kW
17
Содержание EC three 125
Страница 25: ...Wiring plan Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 25 ...
Страница 27: ...Wiring plan Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 27 ...
Страница 29: ...Wiring plan Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 29 ...
Страница 33: ...4 8 Legend Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 33 ...
Страница 147: ...Space for notes 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 147 ...