
4. Before installation
4.1 Converting the exhaust and
supply air connection
The exhaust and supply air connection can be converted to adapt to the local con-
ditions of the installation room.
4.1.1 Converting the exhaust connection
In the following picture the conversion of the top passage to the side or rear pas-
sage of the exhaust connection is represented.
Fig. 4: Conversion of the exhaust connection
1
5
4
3
2
1. Remove lower rear wall (2) of the EuroCondense three
2. Remove the gas connection leading upward and make a 87°arc (1)
3. Turn 87°arc (1) in the desired position (side or towards the rear)
4. Remove either the rear cover plate (3) or the side cover plate (4)
5. Mount lower rear wall (2)
6. Glue upper cover plate (5)
4.1.2 Converting the supply air connection
In the following picture the conversion of the top passage to the side or rear pas-
sage of the supply air connection is represented.
Before installation
16
Condensing gas boiler Eurocondense three125-300 kW
7308536-02 06.13
Содержание EC three 125
Страница 25: ...Wiring plan Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 25 ...
Страница 27: ...Wiring plan Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 27 ...
Страница 29: ...Wiring plan Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 29 ...
Страница 33: ...4 8 Legend Before installation 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 33 ...
Страница 147: ...Space for notes 7308536 02 06 13 Condensing gas boiler Eurocondense three125 300 kW 147 ...