DETAIL "E"
4
LOCKING PINS
WOOD THREADED
INSERT
Floor Anchoring/Base Locating:
8. Install the docking trays (#4) per the layout shown in Appendix B on page #28. First, install the floor anchors
located below the locking pin of each tray; refer to the unique installation instructions provided with the floor
anchors. Next, install the wood threaded inserts provided with the docking tray hardware. This is done by marking
and drilling a hole in the floor using an 11/16" drill bit, then threading the wood insert into this hole using a 10mm
allen wrench. Lastly, place the docking trays over the anchors and attach them to the floor anchors and wood
inserts using the threaded hand wheels provided. Once the docking trays are installed to the court, remove the
locking pins (if they are inserted into the docking trays), roll the backstop into the docking trays, and secure the
portable to the docking trays using the 5/8" diameter, 3" lg. locking pin provided. Refer to Detail "E" above.
WARNING
- If the intention to use shot clocks was discussed with the manufacturer at the time of purchase, the
springs may have been adjusted to account for specified shot clock weight and shot clocks must be installed before
the shipping clamps are removed. Failure to install the specified shot clocks before removing the shipping clamps
may result in personal injury and damage to the product.
REMOVE SHIPPING CLAMP AT THIS TIME
9. Keeping all individuals clear from beneath the unit (front and back), from the side carefully loosen threaded rods
and remove shipping clamps (see Detail “A”) at this time.
www.porterathletic.com
Copyright
2017 by Porter Athletic.
All rights reserved.
888-277-7778
7/23/2018
INST1835
Page 9 of 39
1835 Portable Basketball Backstop
Installation, Operation, and Maitenance Manual
Assembly & Setup