
212
Luggage Compartment, Loadspace and Storage
Inserting and adjusting tie-down rings
Tie-down straps or the luggage net can be
fastened to the tie-down rings.
Make sure that all rings are equally loaded when
securing a load.
The tie-down rings are not designed to restrain
loads in serious accidents.
1. Insert the tie-down ring in the opening
A
of the
mounting rail.
2. Press button
C
down and slide the tie-down
ring in the corresponding direction.
3. Release button
C
.
4. Check that the tie-down ring is locked in
position by pushing it.
5. Insert the remaining tie-down rings.
Note on operation
The opposing tie-down rings must always be
inserted in the opposite direction.
Содержание Cayenne 2009
Страница 116: ...116 Multi Purpose Display and Instruments...
Страница 118: ...118 Multi Purpose Display and Instruments...
Страница 230: ...230 Trailer Hitch Trailer Hitch Trailer Coupling 231 Loading Information 232...
Страница 237: ...Parking 237 Parking Parking Aids 238 Swivelling down mirror glass as parking aid 242 Garage Door Opener 242...