POM2-3333
Merger Unit Test User
Manual
24
3.3 Abnormal SMV
3.3.1 Wiring connection
POM2-3333
MU
SV: 9-2 (or 9-2LE)
IEC 60044-8
Note: The wiring connection can be kept the same.
3.3.2 Test configuration
Keep the configuration the same.
While making the independent test, the users only need select configuration zone to
choose the message type. There are IEC61850-9-2 and IEC60044-8 available. Refer to
part 3.1.2.2.
3.3.3 Start Test
3.3.3.1 Parameters
Please refer to part 3.1.3.1.
3.3.3.2 Start Test
Press button
on the test interface
or
on the tester POM2-3333 or F2 on the
externally PC to run the test
3.3.3.3 Real-time monitoring data
3.3.3.4 Test result
When the result keeps stable, press
and the data will be uploaded to the
report.
Содержание POM2-3333
Страница 6: ...POM2 3333 Merger Unit Test User Manual 6 Right panel ...
Страница 31: ...POM2 3333 Merger Unit Test User Manual 31 ...
Страница 49: ...POM2 3333 Merger Unit Test User Manual 49 3 9 3 3 Real time monitoring data ...
Страница 52: ...POM2 3333 Merger Unit Test User Manual 52 Press Fresh to get the latest messages GOOSE Analysis ...