3-1
3 First Steps
3 First Steps
NOTE!
The components marked with an (*) are described in detail in separate manuals !
3.1
Unpacking and Inspection
CAUTION!
Misalignment caused by shock !
Protect the unpacked scanning heads from hard
shocks !
Unpacking
The scope of supply includes the following components:
•
PSV-F-500-HM front-end
•
PSV-E-530 junction box
•
PSV-I-500 scanning head
•
PSV-W-500-M data management system consisting of industrial PC with
mouse and keyboard
•
TFT monitor with monitor cable and mains cable
•
VIB-A-T02 light duty tripod with fluid head
•
Acquisition cable (ACQ HM)
•
SMB-SMB connecting cable
•
2 BNC-SMB connecting cables
•
Main cable (Umbilical)
•
Mains cable for the multiple mains socket
•
3 mains cables for the system components
•
3 BNC cables
•
3 network cables
Available as an option:
•
PSV-A-013 system cabinet
•
PSV-A-410 close-up unit
•
PSV-A-430 acoustic gate unit with BNC cable*
•
PSV-A-T11 heavy duty tripod with motorized pan-tilt head, connector box
and mains cable (instead of the VIB-A-T02)
•
PSV-A-T18 test stand
•
PSV-A-515 digital video camera with standard lens (optionally with zoom
lens), IEEE-1394 cable (FireWire®) and tripod adapter angle
•
Optical PSV-A-HNeBF block filter for the video camera of the scanning
head
•
VIB-A-T05 tripod with geared head
•
PSV-A-525 protective window
•
Laser adjustment eyewear
Содержание PSV-500
Страница 10: ...1 6 1 Safety Information...
Страница 14: ...2 4 2 Introduction...
Страница 50: ...4 8 4 Making Measurements...
Страница 104: ...C 2 C Declaration of Conformity...