D. Installation
D.9 Manual
Path:
Home
>
Installation>
Manual
Manual Testing procedure of outputs.
This procedure is required to operate manually the
relays exits and to 0-10v
(if any) so the controlbox
functionning and the extension slots
(
HXNE
,
HDY6
,
HXDA
)
connections can be tested.
D.9.1 Relay outputs
Path:
Home
>
Installation>
Manual>
Relay outputs
Alarm relays on board of
Xfarm
are set into
hand
mode
When quitting the procedure, the relay automatically goes back to OFF.
Hand working of Ventilation step 1 relay.
When quitting the procedure, the relay automatically goes back to OFF.
Hand working of Free timerrelay.
When quitting the procedure, the relay automatically goes back to OFF.
---Xfarm alarm
Ventilation 1
continue untill to...
R30 Free
D.9.2 0-10V outputs
Path:
Home
>
Installation>
Manual>
0-10V outputs
Manual working of Exit 0-10V N.1
when quitting the procedure, the exit automatically goes back to 0.0V
Manual working of Exit 0-10V N.4
when quitting the procedure, the exit automatically goes back to 0.0V.
U01 (0-10V output name)
continue untill to...
U04 ( 0-10V output name)
Testing procedure is not recommended for the manual functionning of the system but only
for testing purposes.