
Plug-In Solar
289 London Road | Burgess Hill | West Sussex | RH15 9QU
www.pluginsolar.co.uk | [email protected] | 01444 672005
Page 18
INSPECTING AND TESTING YOUR PLUG-IN SOLAR INSTALLATION
As part of the G83/2 on-site commissioning tests you shall carry out a functional check of the loss
of mains protection, for example by removing the supply to the Plug-In Solar kit during operation
and checking that the Plug-In Solar Connection Unit operates to disconnect the Plug-In Solar Kit
from the DNO’s Distribution System.
In the UK the installation of a Plug-In Solar Kit is considered non-notifiable electrical work under
Part P of the Building Regulations 2013, as it is an alteration to an existing installation (the mains
grid).
“Regulation 12(6A) sets out electrical installation work that is notifiable. All other electrical
installation work is not notifiable – namely additions and alterations to existing installations outside
special locations, and replacements, repairs and maintenance anywhere.”
Installation of a non-notifiable Plug-In Solar kit should still be designed, installed, inspected, tested
and certificated in accordance with BS 7671.
For more information on how to do this, you can find a copy of Part P building regulations here:
http://www.planningportal.gov.uk/uploads/br/BR_PDF_AD_P_2013.pdf
Содержание Sheet Metal/Flat Roof Mount Kit
Страница 30: ......