Installation manual SR85/CF COVER FEEDER
1-1
1. Installing the Cover Feeder
1.1 Unpacking
1.
Remove all parts from the Box.
Box containing.
1.
Cover Feeder
2.
Bin extension plate
3.
Feed roller assembly
4.
Gas spring
5.
Front Installation Bracket
6.
Rear Installation Bracket
7.
Power Supply Harness, PSH
Tie wraps
Cable holders for the PSH
8.
Communication cable
9.
Cleaning plate and folder springs (4x)
2. Bin extension plate
3. Feed roller assembly
4. Gas spring
5. Front Installation Bracket
8.Communication cable
6. Rear Installation Bracket
7. Power Supply Harness
1. Cover Feeder
9.Cleaning plate