RR 14 EVO 2-400 HYBRID
9.6. UNDER LIVE OLE (OLE: OVERHEAD LINE EQUIPMENT)
I
Caution
On / Off Tracking under live OLE must be done in conjunction with the relevant authority and must be
controlled and supervised by Machine Controller / Coss / PICOW / and in compliance with the specific
method statement and risk assessment etc.
Procedure on the tracks
These procedures allow the machine to be manoeuvred, therefore all the operations should be
controlled by the person in charge.
‒
The person in charge should open the hood of the machine on the main panel side, should insert the
column rotation locking pins, turn the
OLE
key selector to the “moving under live lines” position and
remove the key, activate the hydraulic isolation valve of the
OLE
lines, lock with the relative padlock
and remove the keys.
‒
Close the hood.
‒
The operator should verify that the boom cannot move.
‒
On / Off tracking will only take place at a designated
RRAP
.
‒
Manoeuvre the machine so that the rail wheels are aligned as accurately as possible with the tracks.
‒
Lower the railway axle starting with the axle
(N2)
.
Continue the operation until the rubber tyres
near the moving axle lift off the ground.
‒
If necessary move and align the axle
(N1)
with
the tracks with the help of the steering wheel.
‒
Insert the steering wheel locking pins.
‒
If necessary raise the jib so that the bucket
does not touch the tracks.
Sequentially lower rail gear ensuring cage
remains as low as possible without ground or
rail head (cage floor must never exceed
1250
-1300 mm
from Rail Head.
‒
Completely lower the railway axle
(N2)
.
‒
Completely lower the railway axle
(N1)
.
(The railway axle
(N1)
cannot be manoeuvred
until the axle
(N2)
is in position resting on the
tracks).
‒
The correct position of the axles on the tracks is
indicated on the machine control system
display.
‒
Test forward / reverse to ensure correct
functioning of drive and rail direction lights.
GRUPPO
English
89/150
Содержание RR 14 EVO 2-400 Hybrid
Страница 2: ......
Страница 4: ...4 150...
Страница 16: ...RR 14 EVO 2 400 HYBRID 2 2 2 MAIN SAFETY SIGNALS BRANO English 16 150...
Страница 19: ...RR 14 EVO 2 400 HYBRID 2 2 3 INFORMATION SIGNALS BRANO English 19 150...
Страница 22: ...RR 14 EVO 2 400 HYBRID 2 2 4 MULTILINGUAL SAFETY SIGNALS BRANO English 22 150...
Страница 23: ...RR 14 EVO 2 400 HYBRID BRANO BRANO Indicates caution during handling BRANO English 23 150...
Страница 27: ...RR 14 EVO 2 400 HYBRID 26 Main engine unit 27 Auxiliary engine unit GRUPPO English 27 150...
Страница 34: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 34 150...
Страница 69: ...RR 14 EVO 2 400 HYBRID BRANO English 69 150...
Страница 70: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 70 150...
Страница 148: ...RR 14 EVO 2 400 HYBRID 14 ENCLOSED DOCUMENTATION 14 1 HYDRAULIC SYSTEM GRUPPO English 148 150...
Страница 149: ...RR 14 EVO 2 400 HYBRID 14 2 ELECTRICAL SYSTEM GRUPPO English 149 150...