4.3. MAKING READY FOR USE
Before using a new machine it is necessary to inspect it carefully for any evidence of damage sustained during
shipment and then to give it routine inspections as indicated in the section “Inspections to be done routinely
and on receiving the machine”.
During start up and initial operation, the machine must be checked carefully for hydraulic fluid leaks.
The activities for making the machine ready for use come under the responsibility of personnel in charge.
The activities for making the machine ready for use come under the responsibility of personnel in charge.
Make ready requires common sense (for example the telescopic boom should extend and retract without
encountering obstacles and the brakes should work correctly) combined with a series of visual inspections.
The compulsory requirements are listed in the section “daily visual inspections”.
It is necessary to verify that the directions listed in the sections “Inspections on receipt”, “Routine Inspections”
and “Daily working order check” have been followed.
4.4. INSPECTIONS TO BE DONE ROUTINELY AND ON RECEIPT
|
Note
Annual inspection must be done no more than
13
months after the previous annual inspection.
The inspection must be carried out by qualified personnel who have experience with our products.
The following list systematically outlines the inspection procedure aimed at detecting parts that are defective,
damaged or incorrectly installed. The list indicates the components to be inspected and the conditions to be
examined.
Regular inspections should be done after every
3
months or
150
hours of use, whichever expiry comes first or
at closer intervals where environmental conditions or heavy duty and frequency of use require.
This list is also applicable for machines placed in storage or those exposed to severe or changeable climates
and must be carefully followed.
These inspections must also be done after maintenance work has been carried out.
4.4.1. FRAME
‒
Check that the tyres are not consumed, that the components and nuts and bolts are tightened in
position.
‒
Check that the solenoid valves and hydraulic tubes are not damaged or leaking and that they are
secured in position.
‒
Check the drive gears, electrical or hydraulic motors, brakes and any hydraulic tubes present for
damage or leaks.
‒
Check the voltage in the electrical connections, make sure that there are no traces of corrosion or
exposed wires.
‒
Check the oil level in the drive gears (if necessary contact the service personnel for assistance).
‒
Make sure that the hydraulic tubes are not damaged or leaking.
‒
Check all electrical cables for damaged or missing parts.
‒
Check accessories, making certain that they are not damaged, that no parts are loose or missing, and
that they are locked in position.
‒
Check all the access doors for damage and that the locks and hinges work correctly and are secured in
position.
English
43/150
Содержание RR 14 EVO 2-400 Hybrid
Страница 2: ......
Страница 4: ...4 150...
Страница 16: ...RR 14 EVO 2 400 HYBRID 2 2 2 MAIN SAFETY SIGNALS BRANO English 16 150...
Страница 19: ...RR 14 EVO 2 400 HYBRID 2 2 3 INFORMATION SIGNALS BRANO English 19 150...
Страница 22: ...RR 14 EVO 2 400 HYBRID 2 2 4 MULTILINGUAL SAFETY SIGNALS BRANO English 22 150...
Страница 23: ...RR 14 EVO 2 400 HYBRID BRANO BRANO Indicates caution during handling BRANO English 23 150...
Страница 27: ...RR 14 EVO 2 400 HYBRID 26 Main engine unit 27 Auxiliary engine unit GRUPPO English 27 150...
Страница 34: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 34 150...
Страница 69: ...RR 14 EVO 2 400 HYBRID BRANO English 69 150...
Страница 70: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 70 150...
Страница 148: ...RR 14 EVO 2 400 HYBRID 14 ENCLOSED DOCUMENTATION 14 1 HYDRAULIC SYSTEM GRUPPO English 148 150...
Страница 149: ...RR 14 EVO 2 400 HYBRID 14 2 ELECTRICAL SYSTEM GRUPPO English 149 150...