14
L-350 MECHANICAL INSTALLATION GUIDE
PREPARING FOR INSTALLATION
Necessary tools, equipment and people:
- SAE Hex wrenches / T-handle wrenches with
key sizes up to 3/8”. Almost all of the fasteners
you will have need to remove, install, or adjust
will require these hex-keys.
- An SAE socket-wrench set, with several inches
of extension length is required for adjustment
of the RA/Azimuth balancing mechanism.
- At least 2 people able to lift 60 pounds
comfortably. Please consider the component
weights (below) and the weight of your tele
-
scope (possiblly with instrumentation attached)
before assembling your team. It is important to
note the orientation in which the telescope will
be loaded, as it is
Alternatively, a crane or fork-lift may be used
to lift and place the mount, depending upon
accessibility of the observatory and pier to
such equipment.
Component weights:
L-350 System: 110 LBS
L-350 Fork-Arm: 70 LBS
L-350 Base-Motor: 40LBS
EQ Wedge (Optional): 100 LBS
Содержание L-350
Страница 1: ...L 350 MECHANICAL INSTALLATION GUIDE ...
Страница 3: ...3 SYSTEM DIAGRAMS 1 SIDE VIEW OUTSIDE OF FORK ARM ...
Страница 4: ...4 L 350 MECHANICAL INSTALLATION GUIDE SYSTEM DIAGRAMS 2 SIDE VIEW INSIDE OF FORK ARM ...
Страница 5: ...5 SYSTEM DIAGRAMS 3 REAR AND OVERHEAD VIEWS ...
Страница 32: ...PLANEWAVE COM 1375 N MAIN STREET ADRIAN MI 49221 310 639 1662 ...