background image

8

PLANETA

PLANET

PLANET

1861

Heben ohne Grenzen

Installation hint

–   Do not use the hoist and trolley without corrosion protection (grease) under free sky 

or leave it there.

–   If it is necessary that the unit has to be used outside, we recommend to construct 

a littel “hut” or only a roof like a “car port” to protect the unit against rain and other 

environed aggressive infl uences. A new PLANETA-hoist is not restricted in use 

outside or under the described conditions, but during the operations while chains 

move and wheels drive, there will be wear on metal parts where corrosion can take 

effect. This is not a warrenty claim! Mainly high temperatures, high air moisture, 

acid atmospheres, poison steams or high dust polution are the major reasons why 

a hoist can get wear and can get a shortened life time. Mechanical moving parts 

are mostly affected. Watch these parts generally and keep them greased and 

maintained whenever it seemes to be necessary.

–   When your unit will be used daily and it is important that it functions absolutely for 

sure, please buy a spare unit to have it at hand in case of trouble. This avoids down 

time in your production.

–   Do not allow the unit and chain to be exposed to extremely cold whether. Do not 

apply loads to a cold chain. Temperatures lower -20°C or high60°C may 

decrease the safe working load. Call manufacturer if in doubt!

5. Installation

Prior delivery, all units have been lubricated, tested with full load and overload and they 

received a test certifi cate.

The distance and carrying bolts of the trolley are equipped outside with distance 

sleeves/discs which could be released after displacing of the nuts. Then move the side 

plates as far as necessary to the outside that the trolley can be lifted from beneath 

over the beam fl ange. Now push the trolley side plates in direction to the beam fl ange 

until the wheels fi t correctly the beam fl ange. Tighten the distance sleeves and the nuts 

again. See table for torque. If the beam is open at one end, it is easier to roll the trolley 

from there directly on the beam. Once the trolley is installed, move it for fi rst test. Hand 

chains should hang down proper and freely and should not have any kinks or twists. 

After this worked fully satisfying and safe, you can start with the normal operation of 

the trolley.

Содержание HD3N-G-VZ

Страница 1: ...tion Maintenance Reprint also in extracts only with written permission of PLANETA Hebetechnik GmbH 01 05 02 0000 0714 00 BA EN PLA IMPORTANT READ PRIOR USE PLANETA Hebetechnik GmbH Resser Str 17 23 D 44653 Herne Tel 49 2325 9580 0 Fax 49 2325 77077 info planeta herne de www planeta hebetechnik de ...

Страница 2: ......

Страница 3: ...zen Table of content 1 Introduction 2 Name plate 3 Safety precautions 4 Working 5 Installation 6 Periodic inspections Repair and Maintenance 7 Spare part lists 8 Annual UVV testing EG DECLARATION OF CONFORMITY EG DECLARATION OF INCORPORATION Notes ...

Страница 4: ...ser It is worthless in a hidden file If you need further copies we shall be pleased to forward them Mind these instructions also in regard of your purse wrong maintenance unproper use or accidents owing to miswatching of regulations exclude our guarantee and liability To maintain working safety repairs may only be carried out by trained mechanics and only original Planeta spare parts should be used...

Страница 5: ...erial number year of manufacturing or other typical design details we should be able to find out the proper part which you require For further information in English language please order our English manual 3 Safety remarks Some works and some way of operations are not allowed with the chain hoist and trolley of any type because they may distroy the hoist or trolley or they can do invisible damage ...

Страница 6: ...more danger from untrained or not special advised workers using this hoist trolley not in the sense of its originated purpose Please make sure that only people with education and clear senses will use it Please add to this chapter the instructions given by your company i e regarding daily inspections test procedures working processes records and all instructions you think that they are helpfull to...

Страница 7: ...ease check whether the supplied hoist is in accordance with your purchase order check completeness and tightness of all bolts and nuts Make sure that there occured no damages during transportation Copy and write down the date from name plate into your operation manual after inspection of the hoist and trolley Take fully care that the maintenance and operation manual is in reach of the personel who...

Страница 8: ...se buy a spare unit to have it at hand in case of trouble This avoids down time in your production Do not allow the unit and chain to be exposed to extremely cold whether Do not apply loads to a cold chain Temperatures lower 20 C or higherthan 60 C may decrease the safe working load Call manufacturer if in doubt 5 Installation Prior delivery all units have been lubricated tested with full load and...

Страница 9: ...the width of the trolley wheels has to be adjusted according this Runway Beam flange width ca 2 mm trolley wheel gauge in mm There are distance discs and distance pipes on the carrying bolts of the trolley The required gauge of trolley can be reached by taking away or adding of these distance elements This mooves the side plates closer or wider to the beam flange It is important that the nuts will b...

Страница 10: ... is too long or too wide to be lifted with one trolley hoist only So if you have to move this part and you have to use two trolleys at each end please chose the capacity of each trolley as big as the total weight of the load This prevents an accident when the load swings and one hoist could get overloaded if too small 6 Inspections Repair and Maintenance When you detect during the disassembling of...

Страница 11: ... 2A 2B 0 1 Side plate B zu 1B HD3N 2B 3 4 Wheel axle HD3N 3 4 4 Circlip HD3N 4 5 10 Nut spring washer HD3N 5 6 2 Distance bolt HD3N 6 7 1 Suspension bolt HD3N 7 8 Adjust washer HD3N 8 9 1 Hand chain wheeö HD3N 9 10 1 Spring pin HD3N 10 11 1 Drive axle HD3N 11 12 1 Bearing house HD3N 12 13A 1 Pinion HD3N 13A 14 2 Chain guide HD3N 14 15 1 Hand chain HD3N 15 20 1 Suspension bolt for swing beam trolle...

Страница 12: ...12 PLANETA PLANETA PLANET 1861 Heben ohne Grenzen 8 Annual UVV testing Type of Test Date Tester Result ...

Страница 13: ...erred to in Annex VII Part B of Directive 2006 42 EC were created We commit ourselves to the special documents to the above mentioned Products to submit a reasoned request to national bodies The transmission is electronic This statement applies only to the above mentioned Products Commissioning is prohibited until it has been determined that the above mentioned Products have been installed properl...

Страница 14: ...Notizen ...

Страница 15: ...Notizen ...

Страница 16: ...PLANETA PLANETA PLANET 1861 Heben ohne Grenzen Your responsible supplier PLANETA Hebetechnik GmbH ...

Отзывы: