![PKP DM08 Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/pkp/dm08/dm08_instruction-manual_1561318052.webp)
Instruction Manual
DM08
10 Cleaning, maintenance, storage
10.1
Cleaning
Clean the DM08 with a dry or slightly damp lint-free cloth. Do not use sharp objects or aggressive
agents for cleaning.
10.2
Maintenance
The DM08 is maintenance-free cannot be repaired by the user. In case of a defect, the device
must be replaced or returned to the manufacturer for repair.
The DM08 has no parts which have to be replaced or adjusted regularly.
Even though the units are maintenance-free, it is recommended to check the flow meter for signs
of corrosion, mechanical wear and damages at regular intervals.
We recommend routine checks at least once annually.
To clean and visually inspect the electrodes and the interior lining, the unit has to be removed from
the pipeline.
CAUTION! Risk of injury!
Perform all installation and connection work only when the supply voltage is switched off.
The connection between sensor and display electronics under voltage must not disconnected or
short-circuited!
Make sure that the plant is shut down professionally.
CAUTION! Risk of injury or material damage!
When removing the unit from the pipeline, take appropriate safety precautions. Always use new
gaskets during the new installation in the pipeline.
Mains fuse:
The mains fuse is located in the terminal compartment. Before replacing the fuse, the power has to
be switched off. Check carefully that the transmitter is voltage free.
The fuse may only be replaced by the exactly same type of fuse!
Mains fuse:
- 5 x 20 mm (according to DIN 41571-3)
- Rated voltage 250 V AC
- Braking capacity
80 A
@
250 V AC
115/230 V
AC
= 100 mA (T)
24 V
DC
= 1 mA (T)
Technical changes reserved
-
51
-