2
X100kPa
BOOST
2
1
0
-1
STEPPING
GAUGE
WATER
TEMP
60
40
120
100
80
STEPPING
GAUGE
20
°C
X100kPa
BOOST
2
1
0
-1
STEPPING
GAUGE
0
0.5
-0.5
1.5
1
MULTI GAUGE
-1
x100 °C
x100 kPa
BOOST
TEMP
Wiring Method and Installation
Remove
the key
Meter Cable
[X2-M5]
[52X-BW]
BASIC WIRING
Installation Example
(In case of MINI R56)
Please carry out wiring with the engine turned OFF and the key removed.
Meter
Switch
(Only X2-M5)
Server
*When inserting, make sure that the OBD
connector is placed in the proper direction.
Backside
of Meter
Backside
of Meter
5-pin Connectors
3-pin Connectors
1-pin Connector
2-pin Connector
Fuse
Connect to Power
Bezel
Part Names
• Meter
• Server (Common)
(View from Car Connection)
(View from Meter Connection)
2
1
Meter Output Connector
Connect the Meter Cable
1
OBD Connector
Connect to get Communication
Signal
2
1-pin Connector
Connect the Fuse Power Cable
3
2 -pin Connector
Connect the 2-pin Connector
from the Switch (only X2-M5)
4
4
3
Dial
Needle
Shows the current
values.
*The X2-M5 can be installed on either the left or right.
*The X2-M5 can be installed on either the left or right.
*The X2-M5 can be installed on either the left or right.
Switch
(Only X2-M5)
Install at desired
place
Fuse
Connect to IGN Fuse
(Not as normal power source)
OBD Connector
Connect to the Diagnostic
Monitoring Connector
Server
Install to out of
the way places
OBD Connector
( IGN = 12V with key switch ON)
*Not as normal power source
Diagnostic
Monitoring
Connector
Mode Lamp
(Only X2-M5)
Lamp ON while show-
ing water temperature.
The 3-pin connectors can be
connected to any of the three
positions
Fuse (3A )