4
866-353-5826
Mount the complete Roller Assembly (factory pre-assembled) on top of the
Gantry Assembly by aligning the four ½” studs on the bottom of the roll base with
the slots in the pads on the gantry legs.
NOTE: THE WINDSCREEN MUST BE ON THE SAME SIDE OF THE
GANTRY AS THE CROSS BRACE NEAR THE TOP OF THE
GANTRY. THE HYDRAULIC MOTOR MUST BE ON THE DRIVERS
SIDE.
Secure the roll base to the top of the gantry with –4- ½-13 nuts and lockwashers
provided. Assemble the Gantry Cylinder to the Clevis Eye Pads found on the
Gantry and roll base using –2- clevis pins and cotters.
NOTE: THE PORTS ON THE CYLINDER SHOULD FACE TO THE LEFT OR
DRIVERS SIDE WHEN VIEWED FROM THE REAR.
Using an overhead crane, chain fall or forklift, with a sling, lift the entire Gantry and
Roller Assembly up on top of the mounting angles. Center the Gantry on the
mounting angles making sure the center of the gantry is aligned with the center of the
chassis. Check to make sure the gantry is plumb and square to the chassis. Weld all
around the bottom of the gantry legs to the mounting angles adding gussets and or
braces (not provided) where necessary. It is strongly recommended that triangular
gussets be added to the gantry to anchor it firmly to the chassis in a front to rear
position to minimize front to rear movement.
2.
INSTALLING THE FLOW DIVERTER AND COVER CONTROL VALVE
Reference: Hydraulic Schematic Drawing
NOTE: FILTRATION OF 30 MICRON OR BETTER MUST BE USED WITH
THESE COMPONENTS.
Select a suitable place for the Cover Control Valve that will allow for ease in
operation while not interfering with the hoist, container or hoist controls. It is
suggested that this valve be mounted on the drivers side of the truck directly behind
the cab. This position will allow for safe and easy operation. In addition, if the hoist
controls are located there, the operator can run both systems from the same location.
Fabricate a mounting plate for the Cover Control Valve that will bolt to the chassis or
weld to an existing bracket. Bolt the valve to the bracket using 5/16 grade 5 hardware
(not provided).
The Flow Diverter, on a conventional hoist may be installed between the pump and
the main control for the hoist, (the Pioneer covering system requires 5 G.P.M. flow
which may adversely affect the hoist function, in this case mount the diverter after the
hoist controls) but on a hook lift, the Flow diverter, must be installed after the hoist
controls (downstream, utilizing a power beyond valve). Pick a suitable place to mount
the Flow Diverter. These components may be hard piped or the diverter may be
bolted to a bracket (not supplied).
Содержание HR 1500 PTO
Страница 14: ...www pioneercoverall com 14 866 353 5826 ...