Fill this Information out Immediately
(It will be needed in the event you need assistance)
Purchase Date: _______________________________
Purchased From: ______________________________
Model No.: ___________________________________
Serial No.: ___________________________________
Options:
_____________________________________
Microprocessor Revision No.: ____________________
The entire machine safety
system must be tested at the start of every shift.
Machine testing should include: (1) proper machine
operation and stopping capability; and (2) verification
of proper installation and settings of all point of
operation guards and devices before the operation is
released for production.
Содержание microguard
Страница 1: ...Installation Manual for the Metal Box Controller Module ...
Страница 45: ...NOTES ...
Страница 46: ...NOTES ...