Installation
9
Customer alarm or interlock circuitry is also provided and wired to the 10 pin connector (RECP.
2) on the back of the heatsink. A plug is provided for ease of connection should any of these
options be used. A jumper is normally provided between pins 3 and 4, and must be removed if
the interlock circuit is connected. Details on using these interlocks may be found on page 11.
Conveyor Sealing Coil
There are several different styles of coils available to adapt to various applications. The method
of mounting is the same for all styles. All coils employ a tank capacitor mounted to the top of
the coil.
Note that the coil has an enclosure on top which houses a tank capacitor, cooling fan, and a
connector for attaching the power cable to the coil. Figure 1 on page 5 shows the normal
mounting arrangement. To mount the coil, rotate the clamp lever counterclockwise. A spring
will force the flanges apart to provide clearance for mounting. The screw mechanism has a stop
that prevents the handle from coming off.
Lift the coil up to the attachment plate and slide it into the slot. Rotate the lever clockwise and
tighten until the coil is secure. Final alignment of the coil is discussed in the Setup section,
starting on page 14.
Содержание UniFoiler 3000
Страница 10: ...4 Introduction This page left blank...
Страница 19: ...Installation 13 This page left blank...
Страница 24: ...18 Setup This page left blank...
Страница 30: ...24 Operation This page left blank...
Страница 36: ...30 Service Dimensions Figure 8 Coil Support Dimensions...
Страница 37: ...Service 31 Figure 9 Enclosure Dimensions Figure 10 Internal Components...
Страница 38: ...32 Service Figure 11 Connection Diagram...
Страница 39: ...Service 33 Figure 12 Electrical Schematic...