PIKA REbus Beacon Скачать руководство пользователя страница 9

 REbus Beacon Installation Manual       M00020-01

 Section 4: Commissioning Beacon

Section 4: Commissioning Beacon

Note: If this is a new Energy Island installation, follow all commissioning procedures for the Islanding 
Inverter and all connected REbus devices before continuing. 

For complete information on powering on and commissioning the inverter, using the inverter front 
control panel, and working safely with the Islanding Inverter, refer to the Islanding Inverter Installation 

and Operation Manuals.  For information on commissioning and configuring other REbus devices, refer 

to individual device documentation.

Commissioning Beacon consists of three steps:

1. 

Power on the system and verify connections

2.  Enable all REbus devices
3. 

Configure Beacon

Step 1: Power on the system and verify connections

1. 

Power on the Islanding Inverter by turning on the AC breaker.

2. 

If prompted, follow the on screen directions to exit the Safety Shutdown.

3. 

Use the left and right arrow buttons to scroll through the device pages. Verify that 

there is a Beacon device page.

4. 

Make sure the blue Internet LED on the front of the inverter is illuminated. If the LED is 
not illuminated, navigate to the inverter Ethernet Settings page and Disable ethernet.  

Step 2: Enable all REbus devices

1. 

Turn on the DC breakers for each connected device.

2. 

Enable the inverter, wait a few seconds for it to connect to the other devices, then 

enable each device.

3. 

Turn the front “Battery Disconnect” switch ON for each smart battery.

Note: Refer to the Islanding Inverter Operation Manual for more information on enabling devices.

4. 

Navigate to the Ethernet Settings page on the inverter control panel and disable 

Ethernet. Refer to the Islanding Inverter Installation Manual for more information on 
enabling and disabling ethernet.

Содержание REbus Beacon

Страница 1: ...M00020 01 Installation Manual REbus Beacon Part of the Pika Energy Island ...

Страница 2: ...REbus Beacon Serial Number RCP Number ...

Страница 3: ...quality If you find any inconsistencies or errors in this document please notify us at sales pika energy com Check the resources tab at www pika energy com for the latest specifications and manuals 12 19 17 Pika Energy Inc All rights reserved All information in this document is subject to copyright and other intellectual property rights of Pika Energy Inc This material may not be modified reproduc...

Страница 4: ...other parts of the system before attempting to use Beacon The companion document to this installation manual is the REbus Beacon Operation Manual Please reference the Operation Manual for information on user configurable settings including the Time of Use TOU Scheduler Symbols used in this Manual WARNING This indicates a fact or feature very important for the safety of the user to prevent injury o...

Страница 5: ... codes and or the National Electrical Code NEC ANSI NFPA 70 WARNING Electrical installation in Canada shall be done in accordance with all local electrical codes and or the Canadian Electrical Code WARNING Connecting the Pika Energy Island to the electric utility grid must only be done after receiving prior approval from the utility company and installation completed only by qualified personnel li...

Страница 6: ...cover This will disable energy sources on the REbus DC nanogrid The inverter screen will display the system DC voltage wait until it falls to a safe level before proceeding 2 Turn off the AC breaker feeding the inverter to disconnect AC power from the system 3 Disconnect all DC power sources by turning off their breakers WARNING Disconnect all smart batteries and turn their Battery Disconnect swit...

Страница 7: ...ssory terminal block 2 Connect the female ethernet connector to the internet i Locate the incoming ethernet cable that connects the inverter to the internet It is connected to the ethernet port located behind the DC wiring terminals Unplug the incoming ethernet cable from this location ii Connect the incoming ethernet cable to the female ethernet connector at the end of the Beacon ethernet and pow...

Страница 8: ... the passthrough into the wiring compartment Keep all wires neatly managed Connect the USB cable 1 The type B square shaped connector plugs in to a port inside the inverter Power Core Remove the black plastic plug from the hole in the bottom center of the Power Core cover to access the port and plug in the cable 2 Connect the type A rectangular shaped connector to the back right hand port on the t...

Страница 9: ...ions 1 Power on the Islanding Inverter by turning on the AC breaker 2 If prompted follow the on screen directions to exit the Safety Shutdown 3 Use the left and right arrow buttons to scroll through the device pages Verify that there is a Beacon device page 4 Make sure the blue Internet LED on the front of the inverter is illuminated If the LED is not illuminated navigate to the inverter Ethernet ...

Страница 10: ...l block is removable Push gently on the terminal block to make sure it is fully seated in its socket Check that the USB cable is connected at both ends Be certain that it is correctly connected to the port inside the Power Core Problem The Inverter isn t connecting to the server Make sure the Ethernet Settings page on the inverter control panel reads Disabled Make sure all ethernet connections are...

Страница 11: ...11 REbus Beacon Installation Manual M00020 01 Section 5 Troubleshooting ...

Страница 12: ...www pika energy com 35 Bradley Drive 1 Westbrook Maine 04092 ...

Отзывы: