PIKA REbus Beacon Скачать руководство пользователя страница 5

 REbus Beacon Installation Manual       M00020-01

 Section 2: Safety Information

Section 2: Safety Information

General Warnings

SHOCK RISK: 

HIGH VOLTAGE ELECTRICITY

WARNING: 

To reduce the risk of injury, read all instructions and caution 

markings before installing Beacon. Consult installation documentation for 
all other REbus devices on the system.

WARNING: 

Beacon must be installed by trained and qualified technicians, 

and in accordance with all instructions.

WARNING: 

Electrical installation in the United States shall be done in 

accordance with all local electrical codes and/or the National Electrical 
Code (NEC), ANSI/NFPA 70.

WARNING: 

Electrical installation in Canada shall be done in accordance 

with all local electrical codes and/or the Canadian Electrical Code.

WARNING:

 Connecting the Pika Energy Island to the electric utility 

grid must only be done after receiving prior approval from the utility 

company and installation completed only by qualified personnel/licensed 
electrician(s).

WARNING:

 

This equipment is NOT intended for use with life support 

equipment or other medical equipment or devices.

WARNING: 

Disconnect all smart batteries and turn their Battery Disconnect 

switches to OFF before servicing the inverter or touching electrical 

terminals. Refer to smart battery documentation for complete safety 
instructions.

Содержание REbus Beacon

Страница 1: ...M00020 01 Installation Manual REbus Beacon Part of the Pika Energy Island ...

Страница 2: ...REbus Beacon Serial Number RCP Number ...

Страница 3: ...quality If you find any inconsistencies or errors in this document please notify us at sales pika energy com Check the resources tab at www pika energy com for the latest specifications and manuals 12 19 17 Pika Energy Inc All rights reserved All information in this document is subject to copyright and other intellectual property rights of Pika Energy Inc This material may not be modified reproduc...

Страница 4: ...other parts of the system before attempting to use Beacon The companion document to this installation manual is the REbus Beacon Operation Manual Please reference the Operation Manual for information on user configurable settings including the Time of Use TOU Scheduler Symbols used in this Manual WARNING This indicates a fact or feature very important for the safety of the user to prevent injury o...

Страница 5: ... codes and or the National Electrical Code NEC ANSI NFPA 70 WARNING Electrical installation in Canada shall be done in accordance with all local electrical codes and or the Canadian Electrical Code WARNING Connecting the Pika Energy Island to the electric utility grid must only be done after receiving prior approval from the utility company and installation completed only by qualified personnel li...

Страница 6: ...cover This will disable energy sources on the REbus DC nanogrid The inverter screen will display the system DC voltage wait until it falls to a safe level before proceeding 2 Turn off the AC breaker feeding the inverter to disconnect AC power from the system 3 Disconnect all DC power sources by turning off their breakers WARNING Disconnect all smart batteries and turn their Battery Disconnect swit...

Страница 7: ...ssory terminal block 2 Connect the female ethernet connector to the internet i Locate the incoming ethernet cable that connects the inverter to the internet It is connected to the ethernet port located behind the DC wiring terminals Unplug the incoming ethernet cable from this location ii Connect the incoming ethernet cable to the female ethernet connector at the end of the Beacon ethernet and pow...

Страница 8: ... the passthrough into the wiring compartment Keep all wires neatly managed Connect the USB cable 1 The type B square shaped connector plugs in to a port inside the inverter Power Core Remove the black plastic plug from the hole in the bottom center of the Power Core cover to access the port and plug in the cable 2 Connect the type A rectangular shaped connector to the back right hand port on the t...

Страница 9: ...ions 1 Power on the Islanding Inverter by turning on the AC breaker 2 If prompted follow the on screen directions to exit the Safety Shutdown 3 Use the left and right arrow buttons to scroll through the device pages Verify that there is a Beacon device page 4 Make sure the blue Internet LED on the front of the inverter is illuminated If the LED is not illuminated navigate to the inverter Ethernet ...

Страница 10: ...l block is removable Push gently on the terminal block to make sure it is fully seated in its socket Check that the USB cable is connected at both ends Be certain that it is correctly connected to the port inside the Power Core Problem The Inverter isn t connecting to the server Make sure the Ethernet Settings page on the inverter control panel reads Disabled Make sure all ethernet connections are...

Страница 11: ...11 REbus Beacon Installation Manual M00020 01 Section 5 Troubleshooting ...

Страница 12: ...www pika energy com 35 Bradley Drive 1 Westbrook Maine 04092 ...

Отзывы: