
6
REbus Beacon Installation Manual M00020-01
Instructions
Section 3: Installing Beacon
Contents of Shipping Box
•
New wiring compartment cover with REbus™ Beacon attached
•
Ethernet and power cable assembly
•
USB type-A to type-B cable
•
¾” plastic split-ring grommet
•
Spare mounting screws for wiring compartment cover
Tools needed
•
#2 phillips screwdriver for wiring compartment cover
•
#0 phillips screwdriver for screw terminals
Instructions
Power down the Energy Island system
1.
Initiate a Safety Shutdown to de-energize the Energy Island system by holding the red
“Shutdown” button on the inverter front cover. This will disable energy sources on the
REbus DC nanogrid. The inverter screen will display the system DC voltage; wait until
it falls to a safe level before proceeding.
2.
Turn off the AC breaker feeding the inverter to disconnect AC power from the system.
3.
Disconnect all DC power sources by turning off their breakers.
WARNING:
Disconnect all smart batteries and turn their Battery Disconnect
switches to OFF before servicing the inverter or touching electrical
terminals. Refer to smart battery documentation for complete safety
instructions.
4.
Remove the wiring compartment cover.
5.
Check that all terminals are de-energized before proceeding.
Pro Tip: You no longer need the old wiring compartment cover. You can save it as a spare, recycle it, or
hang it next to your desk for quick reference!
Содержание REbus Beacon
Страница 1: ...M00020 01 Installation Manual REbus Beacon Part of the Pika Energy Island ...
Страница 2: ...REbus Beacon Serial Number RCP Number ...
Страница 11: ...11 REbus Beacon Installation Manual M00020 01 Section 5 Troubleshooting ...
Страница 12: ...www pika energy com 35 Bradley Drive 1 Westbrook Maine 04092 ...