5. 4 Power
5. 4. 1
Coffee machine power
Step 1: Plug into socket of machine.
D
Step 2: Plug into socket of power.
✓ Power connection is complete.
6
Initial working
*The following steps must be operated to the personnel authorized by t-
he manufacturer.
6. 1 Filling
6. 1. 1
Beans hopper filling
• Open the cover, fill the beans into hopper, cover the cap .
......
......
✓ Beans' filling is complete.
22
Содержание K95
Страница 1: ...Pierro K95 Version 2 Please read the instructions carefully and keep it well ...
Страница 47: ...Step 2 Clink Service Menu tab to the next step Step 3 Input password 1609 tab to the service menu 46 ...
Страница 48: ...Step 4 Click Maintenance then Water draining tab to the next step Step 5 Click OK tab to the next step 47 ...
Страница 59: ... Don t use machine when the tape water is stopped If the machine s upplied with tape water 58 ...
Страница 60: ......