5
Installation and Testing
*The following steps must be operated to the personnel authorized by t
he manufacturer.
5. 1 Prerequisites
5. 1. 1
Installation Site
• Please observe the follow points, otherwise machine will be damaged:
❖ Installation must be on stable, flat, under pressure site, otherwise it
will be out of shape.
❖ Keep far away from high temperature place and heat source.
❖ Installation Site should be revised by the personnel authorized by t
he manufacturer at any time.
❖ Distance between power connection and machine should be less
than 1m.
• Keep enough space for maintenance and operation :
❖ Keep enough space for coffee beans.
❖ Back of machine should kept at least 5CM with the wall. ( Air circu
lation).
❖ Observe local cooking regulations.
5. 1. 2
Weather condition
• Please observe the follow points, otherwise machine will be damaged:
❖ Temperature should be ranged b10
°
C - +40
°
C (50 ·p -104
"F).
❖ Maximum permitted air humidity is 80 % rF.
❖ Using outside of room is not permitted, otherwise it will be damaged
by bad weather. ( Raining, snowing, frost)
• If temperature under -0
·c :
❖ Contact with customer service department before testing.
14
Содержание K95
Страница 1: ...Pierro K95 Version 2 Please read the instructions carefully and keep it well ...
Страница 47: ...Step 2 Clink Service Menu tab to the next step Step 3 Input password 1609 tab to the service menu 46 ...
Страница 48: ...Step 4 Click Maintenance then Water draining tab to the next step Step 5 Click OK tab to the next step 47 ...
Страница 59: ... Don t use machine when the tape water is stopped If the machine s upplied with tape water 58 ...
Страница 60: ......