O P E R AT I N G   A N D   I N STA L L AT I O N   I N ST R U CT I O N S   SYST E M  V E N T E C H   LG   5 0 0   P  

 

 

 

 

 

                PAG E   4 1

When connecting an external water 
re-heater battery, an additional tem-
perature sensor must be connected to 
input AI6. The external supply air filter, 
available as an optional accessory, with 
a cable length of 5 m, part No.:  
40LG040370 is installed downstream of 
the re-heater battery in the air line.  
 
A return flow sensor (immersion sleeve 
or strap-on sensor) must be installed for 
frost protection of PWW-NHR. The hea-
ting circuit of the supply air re-heating 
exchanger may also be operated with 
antifreeze. The fans will stop when a 
frost alarm triggers. 

With room temperature control confi-
gured, the room temperature control-
ler determines a set point supply air 
temperature based on the difference 
between set point temperature and actu-
al temperature, which is then regulated 
by a downstream supply air temperature 
controller. With supply air temperature 
control configured, the higher level room 
temperature control falls away and the 
supply air temperature is regulated 
directly via a set point supply air tempe-
rature.

10.3.8 Connecting a water re-heater
           

 

battery 

 

The complete ventilation  

 

system must be in place along 

 

 with all electrical, hydraulic 

and air-related connections before com-
missioning the ventilation unit. Commis-
sioning or system settings can only be 
performed once all work to the system is 
complete. 

The factory settings on the control unit 
may only be changed by a skilled instal-
ler. Incorrect settings can lead
to errors in the device! 

10.4 INITIAL STARTUP 

Basic procedure for initial startup:  

• 

 

Checking prior to initial startup

• 

 

Are all air lines and integrated compo-
nents installed?

• 

 

Are all system components installed 
and electrically connected?

• 

 

Is the electrical wiring complete and 
the operator control unit installed?

• 

 

Is a functioning condensate connection 
established?

• 

 

Are the air outlets, and inlet and outlet 
valves correctly fitted and in the open 
position?

• 

 

Are the air filters in the ventilation 
unit correctly installed and in a clean 
condition?

• 

 

Are the air filters in the earth heat 
exchanger etc. correctly installed and 
in a clean condition?

• 

 

Are any installed fire dampers in the 
open position? 

Setting the system parameters 

• 

 

Check system components and correct 
settings where necessary

• 

 

Set system parameters, e.g. adjust air 
volume flow / fan speed

• System time

• Set time programme as required

All lines for sensors, actuators, pumps, 
etc. must be connected in accordance 
with the electrical circuit diagram . Lines 
must be dimensioned by an electrician. 
Low-voltage cables must be laid sepa-

rately from mains cables; alternatively, 
screened cables must be used. The 
electrical circuit diagram indicates the 
maximum permissible load capacity for 
potential-free outputs (contacts). 

10.3.5 Control lines

Pumps connected to the control system 
must be intrinsically safe and stallproof. 
Electrical connection with U = 230 VAC 
and Imax  = 2A.

10.3.6 Circulating pumps

Only original fuses with the prescribed 
amperage and dimensions may be used. 

Internal fuse: Glass tube fuse,

 

T16A H 

ø 6,3 x 32 mm träge

10.3.7 Internal control fuse

Содержание Ventech LG 150

Страница 1: ...ble when controlled to local requirements and is valid up to the speci ed maximum air ow volume EU Regulation 1253 2014 ErP 2018 2016 1254 2014 ENERGIA ENERGIJA ENERGY ENERGIE E Z LG 500 W A 42 dB 445...

Страница 2: ...ERNAL AUXILIARY HEATING PAGE 15 4 4 OPTIONAL DEMAND DRIVEN PLANT OPERATION PAGE 15 4 5 OPTIONAL BUILDING AUTOMATION NETWORKING PAGE 16 4 6 VENTILATION UNIT PAGE 17 4 7 SAFETY DEVICES PAGE 21 5 Technic...

Страница 3: ...10 1 PREREQUISITES FOR INSTALLATION OF THE UNIT 35 10 2 DEVICE INSTALLATION PAGE 36 10 3 ELECTRICAL CONNECTION PAGE 39 10 4 INITIAL STARTUP PAGE 41 11 Servicing and cleaning Page 42 11 1 SAFETY DIREC...

Страница 4: ...type PI HMI READ THESE INSTRUCTIONS CAREFULLY BEFORE INITIAL STARTUP OF THE UNIT These instructions contain advice and information about the safe operation ins tallation service and maintenance of the...

Страница 5: ...uitable experience and or knowledge unless supervised by a person who is responsible for their safety or from whom they receive inst ructions on how to use the device The unit is not suitable for inst...

Страница 6: ...TECH may not be removed without prior written approval of the ma nufacturer The manufacturer accords a warranty on spare parts only if they have been installed by an installer who is recognized by the...

Страница 7: ...dangerous electrical voltage The non observance of this warning can lead to injury or danger to life and limb Installation commissioning maintenance and repair must be performed by an authorised spec...

Страница 8: ...of 5 C and a maximum of 40 C The device is intended for free standing installation or wall mounting and may only be set up when there is suitable load bearing oor or wall construction No vibrations m...

Страница 9: ...in operation in the summer for hygienic reasons the air lters have to be repla ced before putting it back into operation In case of simultaneous use of the ven tilation unit with replaces consuming in...

Страница 10: ...optional 15 Suction element with pre lter G4 16 Heater battery for brine EHE earth heat exchanger optional 4 Functioning of the ventilation system In the case of mechanically controlled apartment vent...

Страница 11: ...1 Frost protection via heat exchanger bypass If the ventilation unit has no pre heating exchanger a bypass may be used to pro tect the heat exchanger from freezing Cold outside air will in this case...

Страница 12: ...fficiency alarm limit To trigger the alarm the system must be running the efficiency must be less than the set value and the alarm at low efficiency parameter must be set to Yes 4 2 2 Frost protection...

Страница 13: ...temperature Motor driven valve Set the control range of the motor driven valve 0 10 V 2 10 V 4 2 3 Frost protection via electric pre heating exchanger optional The compact ventilation unit LG 500 P S...

Страница 14: ...l heating exchanger P band P band for PI controller pre heater I time I time for PI controller pre heater 4 2 4 Heat exchanger The Air2 system may use various heat exchangers for heat recovery WRG Byp...

Страница 15: ...STEM EXTENSION FOR EXTERNAL AUXILIARY HEATING The pumped hot water re heating exchanger PWW NHR mixer valves are controlled via 0 10 V signals continuous The circulating pumps will also be activated o...

Страница 16: ...ducts The fan optimiser signal in nitely variable is connected to the analogue input The plant must be tted with 2 sepa rate fan optimisers one each in the supply and extract air ducts 4 4 3 GreenZon...

Страница 17: ...e extract air with integrated wired control elect ronics and an optional PI HMI remote control panel for free standing or wall mounting in frost free rooms Ventilation unit with highly efficient energ...

Страница 18: ...e the fan speed for ex ample can be increased individually air blast ventilation The PI HMI control unit can also be used to make individual operating parameter settings during servicing work 2 Contro...

Страница 19: ...ther directly or via the earth collector into the living space 10 Outdoor air and supply air fan Ensures the air volume ow for the sup ply air provides the living spaces with conditioned outdoor air 1...

Страница 20: ...d ventilation operation via CO2 sensor and or humidity sensor Version Right hand version Left hand version Part no without integrated PTC preheater battery 08LG500P R 08LG500P L Item no with an integr...

Страница 21: ...ed Speed I Speed II Speed III Air volume ow m h 200 300 400 Output in W with external 50 100 Pa 50 65 80 100 130 155 Air volume ow setting range 150 to 550 m h settable in increments of 5 m h Flow eff...

Страница 22: ...he characteristics illustrated are appli cable for the device design with supply air lter quality category F7 extract air lter quality category G4 and the design with PTC pre heater battery in bypass...

Страница 23: ...4 20 26 30 35 40 16 21 26 8000 Hz 19 21 22 13 17 21 11 13 16 17 23 30 11 13 14 Total LWA in dB A 39 41 44 53 55 57 44 48 53 53 55 60 50 51 55 6 Operator control unit The settings made on the ventilati...

Страница 24: ...er from those shown in these instructions 6 2 2 Fan speed To set fan speed press the fan in the lower part of the home screen You can choose between six prede ned fan speeds Off Auto Low Medium High a...

Страница 25: ...icon in the upper right corner of the home screen Begin by pressing the menu icon in the upper right corner of the home screen The following screen is then displayed Home Press this icon to return to...

Страница 26: ...r the whole week Daily program For each day different ventilation settings can be paramete rized Weekday weekend Ventilation set tings on weekdays and weekends are set 1 Switching between the differen...

Страница 27: ...con on the home screen 6 2 4 4 Extended operation If a different pattern of operation is required for a short period of time the weekly program can be overridden The override period can last up to a w...

Страница 28: ...ate in the settings and follow the instructions on the display 6 2 4 7 Settings The following can be set viewed Language Time date Locking of fan speed during adjust ment Setting of fan speed in case...

Страница 29: ...ent Once the required air volume has been reached the fan is locked at its current speed This gives the installer the opportunity to adjust the system ensuring the right amount of air in the individua...

Страница 30: ...PAGE 30 6 2 4 13 Factory reset PIN required Here you can restore factory settings 6 2 4 14 Home PIN required Here you can con gure the icons shown in the lower part of the home screen 6 2 4 15 About...

Страница 31: ...the catch on the bottom of the unit with a at screwdriver and then tipping the cover outwards see illus 2 Once the front cover has been detached the two screws holding the back cover in place can be...

Страница 32: ...out 24V out N C GND Illustration 5 Connecting Modbus via the RJ12 6P4C port Connect the Modbus cable to the Modbus port for a hand terminal on the PI Air2 Master and to the corresponding screw termina...

Страница 33: ...and maintenance The PI HMI touch panel is maintenance free Please contact us if you have any further queries J Pichler Gesellschaft m b H 9021 KLAGENFURT Karlweg 5 Postfach 32 T 43 0 463 32769 The ven...

Страница 34: ...complete with any optional acces sories and that all parts have been delivered in defect free condition N B In the event of any trans port damage and or missing parts this must be reported to the forw...

Страница 35: ...ble collection centres and in compliance with the waste electrical and electronic equipment ordinance WEEE which pro vides for rati cation of community law directive 202 95 EC RoHS and the di rective...

Страница 36: ...e case of line routes outside of the thermally insulated building shell these routes have to be sufficiently insulated in the cold area To ensure proper and functional system operation suitable insula...

Страница 37: ...guarantee fault free function of the con densate discharge 10 2 1 Setting up the ventilation unit free standing installation When mounting the ventilation unit on a wall screw the four rubber buffers...

Страница 38: ...e tank should be lled with sufficient water to test the reliable drainage of water and the leak tightness of all connections before commissioning Upon completion of the work all tools and installation...

Страница 39: ...and secured against being switched back on Electrical connection and work on electri cal components may only be carried out by authorised electricians only The relevant national and local regula tion...

Страница 40: ...7 5 2 9 When installing the control unit sepa rately a standard telephone cable or appropriately designed Modbus cable up to a max length of 50 m can be used We recommend the use of an AWG28 6C ribbon...

Страница 41: ...d by a skilled instal ler Incorrect settings can lead to errors in the device 10 4 INITIAL STARTUP Basic procedure for initial startup Checking prior to initial startup Are all air lines and integrate...

Страница 42: ...rical work observe the Safety instructions under Point 3 2 and in particular Point 3 2 3 for Electrical connection work 11 1 SAFETY DIRECTIONS For all questions pertaining to the sup plied Compact ven...

Страница 43: ...killed personnel only If defects are discovered during the course of maintenance work these must be immediately recti ed to ensure a safe system operation Only genuine spare parts may be used for repl...

Страница 44: ...o the electrical connecting cable to the motor It must not incur any damage A soft brush has to be used to clean the fan blades The fan housing is cleaned with a vacuum cleaner Damage to the rotating...

Страница 45: ...tures we recommend at least an annual cleaning of the conden sate discharge the discharge line and the drain trap siphon For reliable operation of the system fault free functioning of the condensate d...

Страница 46: ...rpose of documenting the service work this table has to be lled in after performance of any work on the system 11 4 6 Service table System installed by Date Item Service work e g lter change Performed...

Страница 47: ...technical improvements to and optimize our products and reserve the right to change the design of the units or the technical speci cations without prior notice Designation Item number Control unit PI...

Страница 48: ...H ZKLFK SURYLGHV IRU UDWLILFDWLRQ RI FRPPXQLW ODZ GLUHFWLYH 5R 6 DQG WKH GLUHFWLYH WKH GLUHFWLYH W 0otor Dnd GULYH YDULDEOH VSHHG 9HQWLODWLRQ FRQWURO 75 ORFDO GHPDQG FRQWURO T9G 3 T9Q SW8 TYL T9Q TYH...

Страница 49: ...ZKLFK SURYLGHV IRU UDWLILFDWLRQ RI FRPPXQLW ODZ GLUHFWLYH 5R 6 DQG WKH GLUHFWLYH WKH GLUHFWLYH W 0otor Dnd GULYH YDULDEOH VSHHG 9HQWLODWLRQ FRQWURO 75 ORFDO GHPDQG FRQWURO T9G 3 T9Q SW8 TYL T9Q TYH T...

Страница 50: ...approximation of the laws of the Member States establishing a framework for the setting of ecodesign requirements for energy related products Die Konformit t mit den Richtlinien wird nachgewiesen durc...

Страница 51: ...OPERATING AND INSTALLATION INSTRUCTIONS SYSTEM VENTECH LG 500 P PAGE 51 Notes...

Страница 52: ...KLAGENFURT AM W RTHERSEE Karlweg 5 T 43 0 463 32769 F 43 0 463 37548 STERREICH 1100 WIEN Doerenkampgasse 5 T 43 0 1 6880988 F 43 0 1 6880988 13 Sales offices in Slovenia and Serbia Sales partners in G...

Отзывы: