![Pichler Ventech LG 150 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/pichler/ventech-lg-150/ventech-lg-150_operating-and-installation-instructions_1554938037.webp)
O P E R AT I N G A N D I N STA L L AT I O N I N ST R U CT I O N S SYST E M V E N T E C H LG 5 0 0 P
PAG E 3 7
The ventilation unit is supplied ready to
operate and ready to plug in.
The ventilation unit is supplied ready
to operate and ready to plug in. Ensure
that there is sufficient room to fit air line
connections, electrical connections and
the condensate connection as well as
to perform maintenance and inspection
work.
After setting down the ventilation unit at
the place of installation, it has to be alig-
ned in position. The ventilation unit must
be installed horizontally and securely.
Alignment of the unit is possible easily
via the adjustable feet of the unit.
Ensure that there is sufficient
distance between the underside
of the device and the floor to
guarantee fault-free function of the con-
densate discharge.
10.2.1 Setting up the ventilation unit-
free-standing installation
When mounting the ventilation unit on
a wall, screw the four rubber buffers
(1) out of the bottom of the device and
screw these into the housing rear (2)
(four rubber buffers are supplied as
standard).
The wall-mounting bracket (3)
supplied as standard should be
fixed horizontally, to a suitable
solid wall capable of supporting the de-
vice weight. The weight of the ventilation
unit without optional accessories is 75
kg.
After installation of the wall mounting
rail the ventilation unit’s two top rubber
buffers are hooked into the wall-moun-
ting strap (3). When doing this it must be
ensured that the rubber buffers engage
properly into the recesses provided for
this purpose. The device is aligned ver-
tically using the rubber buffers screwed
into the underside of the housing rear.
10.2.2 Wall mounting
1
2
3