Fuel injection
9 - 66
Install the connection harness between the control
unit and the fuel injection system. Tool 020481Y.
See page 9-8
Do not carry out connection with the control unit.
Disconnect the connection between the phase-
revolutions sensor and the fuel injection system.
Measure the resistance of the sensor
connecting the multimeter between
the terminals marked and .
Phase-revolution sensor resistance =680
Ω
±15%
YES
NO
Replace the revolutions
sensor.
Check the earthing isolation between one pole and
the shielding.
+
쎻
쎻
-
쎻
S
+
쎻
- = infinity (
>
1M
Ω
)
YES
NO
YES
Содержание 500 cc
Страница 4: ...TABLE OF CONTENTS GENERAL INFORMATION AND MAINTENANCE 1...
Страница 12: ...TABLE OF CONTENTS SPECIFIC TOOLING 2...
Страница 15: ...TABLE OF CONTENTS AUTOMATIC TRANSMISSION 3...
Страница 32: ...TABLE OF CONTENTS FINAL REDUCTION 4...
Страница 34: ...TABLE OF CONTENTS FLYWHEEL COVER 5...
Страница 51: ...TABLE OF CONTENTS FLYWHEEL AND STARTING SYSTEM 6...
Страница 63: ...TABLE OF CONTENTS THERMAL UNIT AND TIMING SYSTEM 7...
Страница 94: ...TABLE OF CONTENTS CRANKCASE AND DRIVING SHAFT 8...
Страница 113: ...TABLE OF CONTENTS FUEL INJECTION 9...
Страница 220: ...TABLE OF CONTENTS LUBRICATION 10...
Страница 228: ...TABLE OF CONTENTS COOLING SYSTEM 11...
Страница 236: ...TABLE OF CONTENCTS STARTING 12...