Fuel injection
9 - 47
9
System pressure control, for practical reasons, must be
carried out by connecting to the pump side.
Connect the manometer to the delivery duct (right side)
and the extention tube to the return duct (left side).
NOTE
: before mounting check that the tool ducts are
clean.
Pressure regulator control
Connect the diagnosis tester 020460Y
see page 9-17.
Select the function menu "ACTIVE DIAGNOSIS".
Select the function "PUMP DIAGNOSIS".
Activate the function with under-panel feed inserted and the engine stopped.
The control unit controls the pump for 30 seconds.
RUNNING
DIRECTION
Содержание 500 cc
Страница 4: ...TABLE OF CONTENTS GENERAL INFORMATION AND MAINTENANCE 1...
Страница 12: ...TABLE OF CONTENTS SPECIFIC TOOLING 2...
Страница 15: ...TABLE OF CONTENTS AUTOMATIC TRANSMISSION 3...
Страница 32: ...TABLE OF CONTENTS FINAL REDUCTION 4...
Страница 34: ...TABLE OF CONTENTS FLYWHEEL COVER 5...
Страница 51: ...TABLE OF CONTENTS FLYWHEEL AND STARTING SYSTEM 6...
Страница 63: ...TABLE OF CONTENTS THERMAL UNIT AND TIMING SYSTEM 7...
Страница 94: ...TABLE OF CONTENTS CRANKCASE AND DRIVING SHAFT 8...
Страница 113: ...TABLE OF CONTENTS FUEL INJECTION 9...
Страница 220: ...TABLE OF CONTENTS LUBRICATION 10...
Страница 228: ...TABLE OF CONTENTS COOLING SYSTEM 11...
Страница 236: ...TABLE OF CONTENCTS STARTING 12...